Railway Preservation News http://www.rypn.org/forums/ |
|
CPR 2816 Update
http://www.rypn.org/forums/viewtopic.php?f=1&t=205 |
Page 1 of 1 |
Author: | Rob Sterne [ Sat Aug 22, 1998 5:03 am ] |
Post subject: | CPR 2816 Update |
The following was posted by Bill Brown in the C-P-R mailing list concern the rebuild of CPR Hudson 2816:<p>"2816 has been in the shop for a couple of months or so. The tender sits<br>outside. All boiler insulation and cladding has been removed as well as<br>most piping and boiler fittings. The stoker has been removed in<br>preparation for conversion to fuel oil firing. My understanding is that<br>the boiler is being readied for hydrostatic testing. The results of this<br>and the other inspections currently being made will be used to determine<br>whether to proceed with the full restoration or not. From the inspections<br>made to date, the boiler appears to be in generally good condition. A new<br>cab is to be built and the tender needs fuel oil conversion work and<br>repairs to fix up some corrosion damage to the top platework. A time frame<br>of 9 months was mentioned for the restoration. Personally, I think it<br>might run longer than this unless CP wants to fast track the job and put a<br>big crew on it...." <br> rsterne@home.com |
Page 1 of 1 | All times are UTC - 5 hours [ DST ] |
Powered by phpBB © 2000, 2002, 2005, 2007 phpBB Group http://www.phpbb.com/ |