 Post subject: WW&F boiler project progress report
PostPosted: Thu Dec 22, 2016 6:36 pm 

Joined: Mon Aug 23, 2004 5:10 pm
Posts: 1182
The WW&F Railway Museum in Maine this week reached the halfway point in its crowd-funding effort to raise $130,000 to build new boilers for two locomotives. With about $66,000 in donations available, the steel for both boilers was ordered, and in fact, the plates had holes for rivets, flues, etc. water-jet cut in December, and in early January, the plates will be rolled to form the boiler barrels. Buying and cutting the steel for both boilers provided economies, saving money since multiple parts could be produced from the same sheets with less wasted material.

Museum volunteers have nearly completed construction of a flanging machine patterned after the Beatty Hydraulic Flanger, which was patented in the late 1930's. Dies have been produced to form the flue sheets and firebox throat sheets for the first boiler, a replacement for WW&F No. 10's boiler. Assembling this boiler will proceed as soon as possible, with the goal of returning No. 10 to service by the end of 2017. WW&F volunteers will do much of the assembly work, with assistance from the certified boilermakers at the nearby Boothbay Railway Village. The museum's Allen deep-throat riveter will be utilized extensively.

The second boiler will be built for No. 11, a brand new locomotive that will be a reproduction of WW&F No. 7, a 1907 Baldwin 2-4-4 Forney. The boiler will be the first major component of the locomotive to be produced, although a number of patterns for new parts, and even a few smaller components, have been produced.

Fund-raising will continue apace, so that as soon as No. 10 is back in service, volunteers can transition to building No. 11's boiler in 2018. For more information, go to http://www.wwfry.org and click on the link to the 21 Campaign, or go to http://www.fundrazr.com/21campaign.


Attachments:
File comment: WW&F's flanging machine
WW&F Beatty flanger.jpg
WW&F Beatty flanger.jpg [ 115.95 KiB | Viewed 3493 times ]
Offline
 Profile  
 
 Post subject: Re: WW&F boiler project progress report
PostPosted: Wed Dec 28, 2016 8:39 pm 

Joined: Mon Aug 23, 2004 5:10 pm
Posts: 1182
More progress! Since I posted my original message on Dec. 22, the fund has grown to nearly $70,000. Many thanks to those folks who have contributed, and keep those dollars coming in. While we've done well so far, we are still a good bit shy of our $130,000 goal, and we appreciate any hep anyone cares to give. And here's to a Happy New Year to all!


Offline
 Profile  
 
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 2 posts ] 

All times are UTC - 5 hours [ DST ]


 Who is online

Users browsing this forum: Google [Bot] and 38 guests


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to: