I'm going to follow Ernie Hunt's lead and will just post our progress reports for the J&LNG to one thread.

Not only must the 58 be completed and prepared for operation but we also have track to build and at least one turnout to install this spring and summer. Somewhere on the list is the construction of a rider car as well.


Attachments:
File comment: I would like to use 100RB rail as much as possible with 85 ASCE turnouts. Those two rail sizes are fairly close in size and making comp joints is rather straightforward by shaving a little off of the 100RB bars. We also use full sized ties cut in half.
2018-03-31 17.51.48 small.jpg
2018-03-31 17.51.48 small.jpg [ 191.11 KiB | Viewed 5676 times ]
File comment: Track construction is proceeding northward to the north end of the property. Just behind the Brookville a turnout will be installed to bring a track into the area in the foreground where it will split into two tracks. Those tracks will run behind the Tod Engine Building and be used for storage of rolling stock.
2018-03-31 17.33.03.jpg
2018-03-31 17.33.03.jpg [ 143.78 KiB | Viewed 5676 times ]
File comment: J&L 58's boiler is now back on the property. It got a partial front tube sheet, new tubes and the bottom half of the smokebox replaced. I'm now finishing up on some work including lapping in the throttle, replacing some studs and a sandblast and paint.
2018-03-26 16.53.58 small.jpg
2018-03-26 16.53.58 small.jpg [ 158.84 KiB | Viewed 5676 times ]

_________________
From the desk of Rick Rowlands
inside Conrail caboose 21747
Offline
 Profile  
 
 Post subject: Re: J&L Narrow Gauge Railroad 2018 Progress Reports
PostPosted: Sat Apr 07, 2018 8:05 am 

Joined: Thu Sep 22, 2011 4:29 pm
Posts: 1899
Location: Youngstown, OH
More photos


Attachments:
2018-03-23 17.50.30 small.jpg
2018-03-23 17.50.30 small.jpg [ 129.92 KiB | Viewed 5669 times ]
File comment: I attended the Midwest Narrow Gauge Shows a couple of weeks ago and had the first chance to run our scratchbuilt HON30 model of the 58. Also had the chance to pose it next to this Maine Forney as well as a standard gauge boxcar. In real life 58 weighs approximately twice as much as the Forney or the 40' boxcar.
2018-03-23 16.12.50 small.jpg
2018-03-23 16.12.50 small.jpg [ 152.26 KiB | Viewed 5669 times ]

_________________
From the desk of Rick Rowlands
inside Conrail caboose 21747
Offline
 Profile  
 
 Post subject: Re: J&L Narrow Gauge Railroad 2018 Progress Reports
PostPosted: Sat Apr 07, 2018 8:25 am 

Joined: Thu Sep 22, 2011 4:29 pm
Posts: 1899
Location: Youngstown, OH
We are attempting to not only operate a former steel mill locomotive but to also replicate the unique rolling stock found on narrow gauge steel mill operations. Aside from the occasional ingot car or ladle that gets plinthed here in the rust belt, nobody has of yet tried to preserve this unique form of railroading.

In an integrated steel plant, the open hearth steelmaking furnaces were charged with scrap fed into the furnaces via long rectangular charging boxes. Often these boxes were handled by the in plant narrow gauge railroad, loaded in a stockhouse and then shoved down a track in front of the furnace doors. A charging machine would pick each box up, shove it into the furnace, rotate it to dump the scrap then pull it back out and set it back on the car. Since OH furnaces are no longer used in most of the world much of that equipment has been scrapped. We have found a stockpile of OH charging boxes which will allow us to recreate a charging box train.

The same narrow gauge railroad that served the charging side of the open hearth would usually serve the teeming side, where ingot molds are brought in and filled with molten steel. After each of the cast iron molds was filled with steel, the train would be taken to a holding track to cool before going to be stripped. At the stripper the molds would be pulled off of the ingots and placed on cars on an adjacent track. The molds would go back to the OH to be refilled and the ingots taken to the soaking pits for reheating and rolling. Plans are in the works to obtain used ingot molds of the same size to build this train.

The narrow gauge would also be used to move other items around the plant such as rolling mill rolls, machinery and repair parts. Some of those cars may also eventually be recreated.


Attachments:
File comment: A typical open hearth charging train
524787_10205760060068704_2701120592057740539_n.jpg
524787_10205760060068704_2701120592057740539_n.jpg [ 95.1 KiB | Viewed 5656 times ]
File comment: A typical steam powered ingot mold train
i_216.jpg
i_216.jpg [ 49.56 KiB | Viewed 5656 times ]

_________________
From the desk of Rick Rowlands
inside Conrail caboose 21747
Offline
 Profile  
 
 Post subject: Re: J&L Narrow Gauge Railroad 2018 Progress Reports
PostPosted: Sun Apr 08, 2018 12:40 am 

Joined: Sun Aug 22, 2004 5:58 pm
Posts: 1061
great stuff Rick


Offline
 Profile  
 
 Post subject: Re: J&L Narrow Gauge Railroad 2018 Progress Reports
PostPosted: Sun Apr 08, 2018 7:29 am 

Joined: Sun Apr 05, 2015 1:28 am
Posts: 640
Location: Ipswich, UK
A very interesting and worthwhile project, particularly its coverage of the use of rail transport normally "out of the Public view". I particularly like the HOn30 version as well!
At least I know what these cars (Ingot cars) are that I protographed on a standard gauge "inter-plant" steelworks line in Natrona Heights, PA, a few years back are now - Though the line in this case runs alongside a public street, so you can at least observe the traffic.
Attachment:
11-2780.jpg
11-2780.jpg [ 163.93 KiB | Viewed 5170 times ]

_________________
My Flikr page https://www.flickr.com/photos/72399068@N08/sets


Offline
 Profile  
 
 Post subject: Re: J&L Narrow Gauge Railroad 2018 Progress Reports
PostPosted: Sun Apr 08, 2018 9:34 am 

Joined: Thu Sep 22, 2011 4:29 pm
Posts: 1899
Location: Youngstown, OH
This is our revised track layout proposal which is planned to be constructed over the next couple of years. The yellow is mostly done except for the north fifty feet and the turnout. The light blue will be tackled next year including the western extension that will bring a track down to the parking lot where a boarding platform is planned. The dark blue is the hill track extension that takes us to the far corner of the property. There is probably a 20 foot change in elevation from the front of the property to the rear so the switchback to get there is actually needed.

The enginehouse will have to be relocated at some point since where it is currently located will be the main track after the western extension is built. Fortunately I built it with portability in mind.


Attachments:
Track Construction Program 4-8-2018.jpg
Track Construction Program 4-8-2018.jpg [ 211.92 KiB | Viewed 5089 times ]

_________________
From the desk of Rick Rowlands
inside Conrail caboose 21747
Offline
 Profile  
 
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 6 posts ] 

All times are UTC - 5 hours [ DST ]


 Who is online

Users browsing this forum: Google [Bot] and 30 guests


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to: