Author:  PYZedd [ Wed Aug 28, 2013 6:38 pm ]
Post subject:  Re: White Deer Bridge

Second section being set. It was a gray, drizzly day and the pictures came out with a blue hue.(Sorry....crappy camera)

Attachments:
second piece.JPG
second piece.JPG [ 324.47 KiB | Viewed 7892 times ]

Author:  PYZedd [ Wed Aug 28, 2013 6:44 pm ]
Post subject:  Re: White Deer Bridge

Third section being set. It is the piece over the roadway(White Deer Pike). It was a slow process, jiggling it into location.

Attachments:
third piece.JPG
third piece.JPG [ 219.59 KiB | Viewed 7889 times ]

Author:  PYZedd [ Wed Aug 28, 2013 6:50 pm ]
Post subject:  Re: White Deer Bridge

The fourth(Last) section settling into position. It Is the southern most piece, against abutment.

Attachments:
last piece.JPG
last piece.JPG [ 326.66 KiB | Viewed 7889 times ]

Author:  thebigham [ Fri Aug 30, 2013 2:00 pm ]
Post subject:  Re: White Deer Bridge

Thanks for the pics!

Author:  PYZedd [ Thu Sep 19, 2013 9:46 am ]
Post subject:  Re: White Deer Bridge

Update: Contractor begins rail placement on north approach to bridge! Bridge is now about a foot higher(Penndot requirement). Track Grade has to be adjusted. Pic of crew connecting to old rails.

Attachments:
Connecting To Old Tracks.JPG
Connecting To Old Tracks.JPG [ 282.52 KiB | Viewed 7704 times ]

Author:  PYZedd [ Thu Sep 19, 2013 9:50 am ]
Post subject:  Re: White Deer Bridge

South Approach: Ballasting in progress. Picture taken from north end of bridge.

Attachments:
South Approach Ballasting.JPG
South Approach Ballasting.JPG [ 273.18 KiB | Viewed 7702 times ]

Author:  PYZedd [ Wed Sep 25, 2013 11:15 pm ]
Post subject:  Re: White Deer Bridge

Crew started putting ties down on the girders of the W.D. Bridge! 9/25/2013 Every third tie is longer to accommodate a walkway and handrail. JL

Attachments:
Ties Going Down.jpg
Ties Going Down.jpg [ 297.31 KiB | Viewed 7568 times ]

Author:  PYZedd [ Sun Oct 06, 2013 8:58 pm ]
Post subject:  Re: White Deer Bridge

The White Deer Bridge is complete!

Attachments:
Bridge is Done.JPG
Bridge is Done.JPG [ 310.02 KiB | Viewed 7421 times ]

Author:  PYZedd [ Sun Oct 06, 2013 9:06 pm ]
Post subject:  Re: White Deer Bridge

Not quite ready to roll a locomotive over the bridge just yet!?! Rail came up about one foot short on north approach! Plus the gradient must be adjusted. Maybe another week and some foreign(to W.D. )equipment may grace the rails in front of the White Deer station for the first time since 1995!!

Attachments:
Well Almost.JPG
Well Almost.JPG [ 345.1 KiB | Viewed 7420 times ]

Author:  PYZedd [ Sun Oct 06, 2013 9:22 pm ]
Post subject:  Re: White Deer Bridge

To those watching this thread who are not close enough to visit, here is White Deer Station in PA. Just north of the refurbished bridge. Restored a few years ago, still in tip-top shape and open to the public on the first Sunday of each month.(Weather Permitting)
We had 3 visitors today,10-6-2013, from Rhode Island, heading home from a speeder run in north central PA. JL

Attachments:
White Deer Station.JPG
White Deer Station.JPG [ 265.35 KiB | Viewed 7418 times ]

Author:  Alexander D. Mitchell IV [ Sun Oct 06, 2013 11:08 pm ]
Post subject:  Re: White Deer Bridge

PYZedd wrote:
Not quite ready to roll a locomotive over the bridge just yet!?! Rail came up about one foot short on north approach! Plus the gradient must be adjusted. Maybe another week and some foreign (to W.D.) equipment may grace the rails in front of the White Deer station for the first time since 1995!!


The gap you see is probably there for some formal, legal reason having to do with whether the trackage is formally "part of the general system" yet. Inspection, signing off on rehab work, etc.

The Chapter's newsletter states that the first official movement on the restored trackage will be to remove two Pullman day coaches and a hopper car for movement to a transload site to the south, to be loaded for shipment to the Durbin & Greenbrier Valley, which has purchased them. (Don't worry, this leaves them with three more Pullmans, several freight cars, two switchers, and two cabooses.)

Author:  Howard P. [ Mon Oct 07, 2013 12:55 am ]
Post subject:  Re: White Deer Bridge

ADM, I beg to differ. While you have a good point, no good track guy would leave such a small gap to accomplish that goal. Leave at least a 20-ft length out (better a full 39-ft), and then install later. This looks more like an "oops". It happens.

Beautiful bridge job-- nice abutment and pier work and really nice deck timbers.

Howard P.

Author:  jrevans [ Tue Oct 08, 2013 12:37 am ]
Post subject:  Re: White Deer Bridge

Thank you for the updates PYZedd! It's great to see something like this come together, even if just via the internet.

Howard P. wrote:
ADM, I beg to differ. While you have a good point, no good track guy would leave such a small gap to accomplish that goal. Leave at least a 20-ft length out (better a full 39-ft), and then install later. This looks more like an "oops". It happens.


I have to agree with Howard on this one. I can understand leaving out a rail length to keep the trackage isolated, but to come up about one foot short really seems like an oops where they didn't properly account for the additional rail length due to the gradient change.

It'll be extra work to make that right.

Author:  Alexander D. Mitchell IV [ Tue Oct 08, 2013 12:44 am ]
Post subject:  Re: White Deer Bridge

Furthermore, I suspect that it's not "kosher" to put two Thermite track welds so close to one another, nor two joints with joint bars...... Might not matter for rare usage by old cars once in a long while, but if they ever fulfill their ambitions of legitimate freight movements to Allenwood, that joint could be trouble.....

Author:  G. W. Laepple [ Tue Oct 08, 2013 3:42 pm ]
Post subject:  Re: White Deer Bridge

I'd be surprised if this wasn't an "oops." The proper way to rectify it would be to cut in a 15 or 20 foot section of rail. It's usual in contracts to require a minimum of 15 feet of rail if a rail breaks or winds up short for some other reason.