Author: | b. barry [ Tue Nov 01, 2016 6:49 pm ] |
Post subject: | Re: WW&F 21 Campaign Boiler Construction- Progress Reports |
The anvil and linkage is now installed in the machine. |
Author: | SteveC [ Wed Nov 02, 2016 10:33 am ] |
Post subject: | Re: WW&F 21 Campaign Boiler Construction- Progress Reports |
This is such an impressive project. As was posted, if this is the way this group tackles hurdles, I don't think that there is going to be many things that are going to stand in their way! Steve |
Author: | Dave [ Wed Nov 02, 2016 11:54 am ] |
Post subject: | Re: WW&F 21 Campaign Boiler Construction- Progress Reports |
I wish some groups I'm affiliated with would take a close look at the business plans and strategies used here and learn a lot from the success that is following. They are among the best.... and deserve all the successes that are coming their way. I can only watch from a distance but there's a lot going on to see. |
Author: | b. barry [ Fri Jan 06, 2017 1:14 am ] |
Post subject: | Re: WW&F 21 Campaign Boiler Construction- Progress Reports |
The hydraulics for the flanging machine have been plumbed. Die sets for bending no. 10's boiler sheets have been cast and delivered. Die sets. All the steel for 10's and 11's boilers has been purchased. The sheets have been cut out on a water jet table and rolled. Jason Lamontagne's pictures. No. 11's barrel sheet after being cut on the water jet table. 11's barrel sheet being lined up with the rolling mill. 11's barrel after rolling. Part of 11's fire box and outer wrapper sheet. In the picture is Jim Heuber, his son Grady and nephew John. Jim runs Mack Bros Boiler & Sheet Iron Works Co., Inc. where the rolling for 10's and 11's boiler parts was done. Jim also donated the riveters that are being used to assemble the boilers. Mud rings for 10 and 11. Mike Fox photo. |
Author: | tomgears [ Fri Jan 06, 2017 1:46 pm ] |
Post subject: | Re: WW&F 21 Campaign Boiler Construction- Progress Reports |
Amazing work. Thank you for sharing. |
Author: | Richard Glueck [ Fri Jan 06, 2017 9:15 pm ] |
Post subject: | Re: WW&F 21 Campaign Boiler Construction- Progress Reports |
Absolutely stunning! So pleased to see this project move so swiftly. |
Author: | b. barry [ Fri Jan 06, 2017 10:58 pm ] |
Post subject: | Re: WW&F 21 Campaign Boiler Construction- Progress Reports |
No. 10's firebox, outer wrapper and smokebox. Compare the size difference between 10's and 11's firebox and wrapper. No. 10 is a 12 ton 0-4-4 and no. 11 will be a 27 ton 2-4-4. The no. 10 parts are in the back of a Toyota Tacoma pickup truck vs the no. 11 parts sitting in front of the Mack Bros. building. |
Author: | b. barry [ Sat Mar 11, 2017 12:05 am ] |
Post subject: | Re: WW&F 21 Campaign Boiler Construction- Progress Reports |
The flanger was tested for the first time last Tuesday. There are a couple of mechanical issues to address but the flanger successfully bent a piece of scrap boiler plate. Piece of plate clamped on the anvil at the start of the bending process. The oil is from a loose hydraulic fitting on the clamping ram that has been fixed. Start of the bend. Test bend complete. |
Author: | John Risley [ Sat Mar 11, 2017 2:21 am ] |
Post subject: | Re: WW&F 21 Campaign Boiler Construction- Progress Reports |
So glad these folks never got the memo that it can't be done. Wonderful progress and follow through. Great pictures. Thanks for sharing. John. |
Author: | daylight4449 [ Sat Mar 11, 2017 8:35 am ] |
Post subject: | Re: WW&F 21 Campaign Boiler Construction- Progress Reports |
If we can put men on the moon, damn straight that some guys in Maine can build some boilers! Keep it up gents. |
Author: | b. barry [ Wed Apr 19, 2017 5:47 pm ] |
Post subject: | Re: WW&F 21 Campaign Boiler Construction- Progress Reports |
To get a feel for operating the flanging machine a replica of number 10's firebox corner was laid out and flanged out of a piece of scrap plate today. Tomorrow the crew plans to flange the real firebox sheet. |
Author: | ted66 [ Thu Apr 20, 2017 11:20 pm ] |
Post subject: | Re: WW&F 21 Campaign Boiler Construction- Progress Reports |
Folks, This museum did not get where it is today overnight. The WW&F newsletters going back to the beginning in 1989; are posted on their web site ww&f.org. I never expected to see the #9 in steam after it sat in a Connecticut barn for close to 70 years! But she is! Read them and enjoy! Ted Miles WW&F Ry Museum Life Member |
Author: | John E. McNamara [ Fri Apr 21, 2017 12:19 am ] |
Post subject: | Re: WW&F 21 Campaign Boiler Construction- Progress Reports |
ted66 wrote: Folks, This museum did not get where it is today overnight. The WW&F newsletters going back to the beginning in 1989; are posted on their web site ww&f.org. I never expected to see the #9 in steam after it sat in a Connecticut barn for close to 70 years! But she is! Read them and enjoy! Thanks for the kind words, Ted. However, the WW&F newsletters are considered a benefit of membership, and the on-line copies at forum.wwfry.org are only available when you are a member. [begin membership plug] Membership is only $30 for a year or $300 for life. [end membership plug] |
Author: | Pat Fahey [ Fri Apr 21, 2017 8:32 am ] |
Post subject: | Re: WW&F 21 Campaign Boiler Construction- Progress Reports |
Hi I glad that the WW&F is coming along with all the projects they are planing , inclueing building new passenger coaches . The WW&F depends on the membership to help with the expends and donations in order to keep these projects moving . I hope the WW&F don't bite off , more than they can crew, I would like to see them finish off projects , before starting a new one . |
Author: | elecuyer [ Fri Apr 21, 2017 10:23 am ] |
Post subject: | Re: WW&F 21 Campaign Boiler Construction- Progress Reports |
Pat Fahey wrote: I hope the WW&F don't bite off , more than they can crew, I would like to see them finish off projects, before starting a new one. I think we have a pretty good track record on major restoration projects:
Short term:
Longer term:
I'm sure I'm forgetting stuff, and these are just the major projects/accomplishments. We're proud of our track record. We tend not to undertake projects until funds are raised to the level that we are certain that we will have enough to complete the task. (Note that all the projects underway for 2016-2017 are fully funded.) Like everything else, sometimes projects take a bit more time (or money or both) than we anticipated. However, we ensure that we undertake only tasks that we are confident we will complete, and always strive to do it the right way, even if it takes a bit longer (or costs more) to do so. Anyone who would like to see some additional details of what we have done should check out: http://wordpress.wwfry.org/?page_id=80 Anyone who would like to see our last long-term plan is welcome to peruse our 2012 document. Note that nearly every project or goal listed there is now completed, or underway. http://wordpress.wwfry.org/?page_id=179 |