It is currently Mon Sep 28, 2026 6:28 pm

All times are UTC - 5 hours [ DST ]




Post new topic Reply to topic  [ 2 posts ] 
Author Message
 Post subject: Sweetbriar Park RR
PostPosted: Sat Jul 26, 2003 1:27 pm 

Anyone know more about this (apparently) backyard RR in Oregon? Is it narrow gauge?

http://news.statesmanjournal.com/article.cfm?i=65049
ryarger@rypn.org


  
 
 Post subject: Re: Sweetbriar Park RR
PostPosted: Wed Jul 30, 2003 10:12 pm 

> Anyone know more about this (apparently)
> backyard RR in Oregon? Is it narrow gauge?
I can probably answer any questions you have regarding this railroad. It was the dream of my father's, and he built it by hand over a period of 35 years. The RR is 24" gauge (2 Ft) and has about 1 mile of track through a wooded park also built by dad.
The motive equipment consists of two locomotives, fashioned after Plymouth switchers, one that he built in the basement of our home, the other completed shortly before he passed away in May of 2002. He also has a "steam" locomotive that was built in the 30's and ran at the Oregon State Fair until an engineer allowed the water to run low. The engine was converted to gas (Model A engine) and continued to run at the state fair until 1952 when it was scrapped becuase the fair board decieded no one would like to ride trains any more. It was salvaged from the wrecking yard, and ran locally in Salem for many years until Dad bought it and moved it to Sweetbrier Park. The park is located about 20 miles east of Salem, Oregon, and operates mostly on weekends in the summer, and then during October (weather permitting) for a Pumpkin Patch. Following Dad's passing away, the train didnt run for a year, but this year several members of a local G Scale club have elected to operate the train to the enjoyment of the folks that have made a tradition of family visits to the park.

Feel Free to contact me if you would like additional information.

As a side note, we do have one 24" Plymouth switcher for sale, (Volkswagen Rabbit power) it is a little heavy for our 20lb rail.

Thanks for the inquiry.
Fritz Krauss

fkrauss@earthlink.net


  
 
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 2 posts ] 

All times are UTC - 5 hours [ DST ]


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Jump to: