It is currently Sat Aug 15, 2026 6:55 am

All times are UTC - 5 hours [ DST ]




Post new topic Reply to topic  [ 21 posts ]  Go to page Previous  1, 2
Author Message
 Post subject: Re: Personal Experience with a Failed Blowdown
PostPosted: Mon Feb 11, 2013 6:23 pm 

Joined: Sun Aug 22, 2004 7:19 am
Posts: 6464
Location: southeastern USA
hamster wrote:
[That was "back in the day". Doesn't Part 230 now require an emergency oil shut off somewhere on the tener?


For insular operators, today is "back in the day." Good ideas don't stop working when regulations change.

dave

_________________
“God, the beautiful racket of it all: the sighing and hissing, the rattle and clack of the cars over the rails. These were the sounds that made America the greatest country on earth." Jonathan Evison


Offline
 Profile  
 
 Post subject: Re: Personal Experience with a Failed Blowdown
PostPosted: Tue Feb 12, 2013 1:21 pm 

Joined: Sun Dec 26, 2004 10:13 pm
Posts: 356
Location: Brooklyn, NY
On the last run or so one afternoon while working on a certain tourist hauler, we had a failed blowdown incident when the valve decided to seize up in the open position while working steam in the worst possible place on the railroad. The fire was dropped immediately and the emptied kettle was inspected, which didn't reveal anything awry. IIRC, the valve was switched out and later rebuilt, the linkage reworked and for good measure and the engine was fitted with a secondary (ball valve) for emergencies. Most fun of all was getting the solid coating of mud off the hoss back at the house that evening, because the piece de resistance to the whole thing was that the responsible party had initiated the blowdown about 50' shy of a cut, which in the heat of the moment was powerwashed all over the locomotive.

_________________
"Buy the ticket, take the ride." -Hunter S. Thompson


Offline
 Profile  
 
 Post subject: Re: Personal Experience with a Failed Blowdown
PostPosted: Tue Feb 12, 2013 1:38 pm 

Joined: Fri Dec 03, 2004 9:42 pm
Posts: 3010
Ed Kelley wrote:
On the last run or so one afternoon while working on a certain tourist hauler, we had a failed blowdown incident.


That brings up another question.

Does your railroad have regulations regarding where and when blowdowns are peformed?

Obviously, if you have excess water, you may not have a choice. But for the regular blowdowns designed to keep the boiler free of mud, are they done in a specific location and at a specific time? For example, at the end of the day after the runs have been completed?

Such a policy could lessen this impact of a valve that sticks open, or refuses to seat completely. That would be a lot easier to deal with in the yard than someplace out on the road with a full train.


Offline
 Profile  
 
 Post subject: Re: Personal Experience with a Failed Blowdown
PostPosted: Tue Feb 12, 2013 2:37 pm 

Joined: Sun Aug 22, 2004 1:51 pm
Posts: 12145
Location: Somewhere east of Prescott, AZ along the old Santa Fe "Prescott & Eastern"
There's been at least one steam railway that performed them at a bridge during the regular passenger run, the better to give the passengers a nice rainbow to look at.

Your mileage, and sun angles, may vary.


Offline
 Profile  
 
 Post subject: Re: Personal Experience with a Failed Blowdown
PostPosted: Tue Feb 12, 2013 3:42 pm 
User avatar

Joined: Sun Aug 22, 2004 1:45 am
Posts: 1138
Location: Beaumont, Texas
Alexander D. Mitchell IV wrote:
There's been at least one steam railway that performed them at a bridge during the regular passenger run, the better to give the passengers a nice rainbow to look at.

Your mileage, and sun angles, may vary.


I can think of two or three others in my area that did it every trip at a particular trestle or location.

_________________
-James Hefner
Hebrews 10:20a

Surviving World Steam Project - New Address!

International Stationary Steam Engine Society


Offline
 Profile  
 
 Post subject: Re: Personal Experience with a Failed Blowdown
PostPosted: Tue Feb 12, 2013 5:12 pm 

Joined: Fri Aug 27, 2004 4:02 pm
Posts: 1880
Location: Back in NE Ohio
Bobharbison wrote:
Does your railroad have regulations regarding where and when blowdowns are peformed?


In running a Polish OL-49 2-6-2 with the Wolsztyn Experience, the practice of the Polish crews on the regular Wolsztyn-Poznan run was to blow down both sides of the boiler after just about every station stop (17 stops in 52 miles). Seemed a bit excessive, but without knowing the quality of the water they are using...


Offline
 Profile  
 
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 21 posts ]  Go to page Previous  1, 2

All times are UTC - 5 hours [ DST ]


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to: