| Railway Preservation News https://www.rypn.org/forums/ |
|
| More White Pass winter troubles 1944 https://www.rypn.org/forums/viewtopic.php?f=1&t=12421 |
Page 1 of 1 |
| Author: | bobyar2001 [ Wed Mar 02, 2005 5:38 pm ] |
| Post subject: | More White Pass winter troubles, 1944 |
From the White Pass list. Some of these locomotives and rotary plows still exist. Nos. 198-200 (USATC Mikados) are believed to have been scrapped in Peru in recent years. TRAFFIC INTERRUPTIONS FROM 27 FEBRUARY 1944 TO 4 MARCH 1944 27 February 1944: About 6:00 AM Sunday, 27 February, Rotary #1, Engines 70-80, coupled with two Extras, 193-256-250 North and 197-200-253 North, encountered bad storm and heavy drifts between MP 16½ and 17 which stalled rotary. Rotary uncoupled from the two extras and attmpted to buck out snow ahead of them, and in so doing, moved about 30 yards north and became stuck in the snow. The two extras attempted to move up to rotary to assist him in getting loose but were unable to do so account of the snow and drifts. As the snow had drifted in behind them, they were unable to back down to Glacier. This information was received from Sgt. Empey, Conductor in charge of Extra 197-200-253 North at 9:45 AM, at which time, he had walked back to Glacier to report. Rotary #2 with Engs. 71-81, caboose, tool car, and Eng. 199 with "A" and "B" Company personnel departed Skagway at 11:30 AM in an attempt to clear the main line to MP 17. They reached the scene of trouble about 1:30 PM and found that caboose, on the extreme south end, was derailed and Eng. 253 dead on main line on account unable to supply her with a sufficient amount of water by shovelling snow into the tanks. The weather was clear with no snow falling, temperatures dropping below the zero mark, velocity of wind increasing hourly. By late Sunday evening they managed to rerail the caboose, dig out Eng. 253 and move them back into Glacier. 28 February 1944: Capt. Battle and his crew continued to work throughout the night attempting to free cars near MP 17 but the fierceness of the wind combined with severe drifting conditions, made it necessary to make several trips between Glacier and MP 17 with Rotary #2 to keep the track open. At 7:00 AM they had brought down 5 cars of Extra 197's Train. On returning to bring down more cars they pulled a draw bar from tank car. While chaining tank car Engines 81-199 became drifted in. They were unable to move them until they returned to Glacier with Eng. 71 to get Rotary #2 to clean up to them. In attempting to switch out Rotary #2 from Glacier, where it had been frozen to the rail, some damage was done to the Rotary tank. Due to the extremely low temperature, and high wind, the "A" and "B" Company men were suffering from long hours of exposure and it was necessary to send relief crews from Skagway at 10:00 AM. Work continued throughout the day and at 7:15 PM Engs. 81-199-197-200, a tank car and caboose were brought into Glacier. High winds continued throughout the night. Capt. Battle reported there are 7 cars, 4 engines, one caboose and one Rotary yet to be moved off the hill. Eng. 81 is returning to Skagway account of bad-order coupler on rear end. 29 February 1944: At 9:10 AM rotary left Glacier cleaning out up to cars that were snowed in and returned to Glacier at 1:15 PM. Rotary took 3 engines and started back up the hill at 1:30 PM, arriving back in Glacier with two cars at 4:00 PM. At 5:35 PM moved 5 cars into Glacier, then necessary to return with plow and clean up. At approximately 5:25 PM, Extra 252 South, with Conductor Fields and Engineer Barkley, moving two cars of oil from Glacier to Skagway lost control of the train about 2 miles north of Clifton. Train was derailed about 1/2 mile north of Clifton turning engine tank over and both oil tanks, broke pipeline which was pumping oil. The oil was set afire and casued considerable damage to engine. Both oil tanks badly damaged and will probably be a complete loss. Ran work train from Skagway in an effort to clear up this derailment. At 11:00 PM dead engine 256 was moved into Glacier. 1 March 1944: At 2:30 AM rotary was working north of Glacier to clean out up to Engine 70 and Rotary #l. At 7:30 AM rotary returned to Glacier. It was reported that they had reached a point to within 75 feet of Rotary #l, but it was storming so badly that their rotary was stuck several times and it was necessary to return to Glacier for water and to wait for the storm to subside. 8:00 AM. Lt. Bogue reports from Clifton that he is not making much progress in picking up wreck at MP 9. Engine 252 and both tank cars are laying over on their side against bank. Both tanks are badly damaged and it is surmised that they will be a complete loss. Cab burned on Eng. 252, trucks driven up under engine, and generally in pretty bad shape. Sending D-8 Caterpillar tractor with winch to Clifton to attempt, to straighten Engine 252. Notified Chief of Staff, Northwest Service Command, it will be impossible to get a train through to make connections with the Nora sailing tonight. 3:00 PM. Wind has subsided some and Captain Battle is going to make another effort to plow up to Rotary #l and Eng. 70. 11:00 PM. Captain Battle is back at Glacier with Engine 70 and Rotary #l. This clears main line from Glacier north. Will coal Rotary #2 by hand and run north from Glacier early in AM. Capt. Battle and Captain Rogers are going to MP 9 to assist picking up derailment at that point. 2 March 1944: Rotary #2, Engines 71-80-199 out of Glacier 7:19 AM enroute to Bennett. Very high winds are reported all the way from Glacier to Bennett. Temperatures are hovering around the zero mark. Both derailed tank cars and tank of Engine 252 are in the clear at Glacier. Engine is in bad shape and it is going to take a lot of jacking to get her upright and near enough to track to attempt to rerail. We are sorely in need of some kind of a crane for lifting, as with block, tackle, and jacks it will be a painfully slow process. 8:30 AM. Rotary fleet #2 back into Glacier with hot wrist pin on Eng. 199. Traded her out for Eng. 193 and fleet out of Glacier at 9:20AM. Rear end of Eng. 252 jacked up and over against rail at 10:30 AM. With reasonable luck it is expected that this engine will be cleared around 6:00 or 7:00 PM. 2:15 PM. Reports from Clifton indicate that Engine 252 is in upright position. A pull was made but engine tended to lead away from tracks. Will require jacking. 5:15 PM. Caterpillar working at MP 9, damaged pipeline. The section foreman at Glacier closed check valves. Ran work extra 254 in from Clifton to pick up Standard Oil pipe gang. (Pipeline repaired and pump started at 1:30 AM 3rd) 6:30 PM. Engine 252 is rerailed and in the clear at Clifton thus opening the line all the way except for snow, which from all indications is going to be hard to clean out. 3 March 1944: Rotary #2 fleet back at Glacier, unable to make any progress plowing out. They had advanced as far as MP 17 when they had to return to Glacier for water. Snow is almost solid, like ice, from 6 to 8 feet deep. Rotary will not take it. Engine 200 is returning to Shops for coal and fresh crew. Engine will return to Glacier to be used as 4th engine in rotary fleet. Wind now reported calm at White Pass, Glacier, and all points north to Bennett. Temperature, 2 to 10 degrees above zero. 8:00 AM. Rotary #3 with Engines 81-197-199 out of Shops to relieve the #2 fleet when they return to Glacier. Will hold engine 200 and cut into fleet #3 at Glacier, giving that fleet 4 engines. 9:45 AM. Rotary #2 back into Glacier for water having plowed to MP 17½. Rotary #3 with Engines 81-197-199 arrived Glacier and is relieving Rotary #2. Rotary #3 arrived White Pass at 2:45 PM. Derailed all drivers on Eng. 81 in siding account of ice in tracks. Rerailled engine and out at 5:10 PM enroute to Fraser. Fleet had to return to White Pass [Station] 4 times for water before they were able to reach White Pass. Snow only about three or four feet deep in most places but very hard and slow plowing. Trouble was encountered with injector on Rotary #3 and Rotary #2 was called to relieve her. 4 March 1944: Rotary #2 with Engines 71-80-200 out of Skagway at 12:50 AM. Out of Fraser 6:40 AM after having relieved Rotary #3 which returned to Shops for repairs. Rotary #2 arrived Log Cabin 8: 00 AM and should have no trouble from that point. Calling Rotary #1 and two 3 engine trains to leave Skagway 10:30 AM to 11:00 AM, and double-header is being called from Whitehorse at same time. Extra 197 North out of Shops 11:55 AM. Delayed at Log Cabin for 4½ hours by Extra 190 South. Arrived Whitehorse 5:00 AM the 5th. Extra 190 South out of Whitehorse at 11:01 AM. Broke axle on tender on Bennett Hill, got into Log Cabin at 9:30 PM and remainder of train was brought into shops by Engines 194-198. Arrivod Shops at 3: 22 AM the 5th. There were 89 northbound loads in Skagway yards on the morning of the 4th awaiting movement. Available northbound net tonnage on hand, 1600 tons. |
|
| Author: | WP&Ymike [ Thu Mar 03, 2005 4:30 am ] |
| Post subject: | Re: More White Pass/USATC winter adventures, 1944 |
The following engines and plows mentioned in the story survive today: Engines 80 and 81 are in Oregon at the SVRy #20 & #19 [operating] Engines 70 and 71 are in Tennessee at Dollywood [one may be operating] Engine 190 is in N Carolina at the Tweetsie RR [operating] Rotary 1 is restored and operable in Skagway Ak Rotary 2 is at Breckenridge Co [?] Rotary 3 is buried in the Skagway river |
|
| Page 1 of 1 | All times are UTC - 5 hours [ DST ] |
| Powered by phpBB © 2000, 2002, 2005, 2007 phpBB Group http://www.phpbb.com/ |
|