It is currently Wed Aug 26, 2026 1:51 am

All times are UTC - 5 hours [ DST ]




Post new topic Reply to topic  [ 10 posts ] 
Author Message
 Post subject: Heber Valley #75 Rebuild
PostPosted: Tue Nov 29, 2005 11:36 pm 

Joined: Wed Feb 02, 2005 2:13 pm
Posts: 243
[redacted]


Last edited by Christian S. on Fri Feb 28, 2025 10:07 pm, edited 2 times in total.

Offline
 Profile  
 
 Post subject: Re: Heber Valley #75 Rebuild
PostPosted: Wed Nov 30, 2005 12:24 am 

Joined: Sun Aug 22, 2004 1:40 am
Posts: 325
Location: UT
With all of the recent discussion of UP618 (featured prominently on tonight's Amazing Race, I might add!) here on RyPN--it must be mentioned that her days are numbered. Mike Manwiller and the shop crew are now pushing GW75 to the front of the jobs list. One major step accomplished about a month ago was shortening the smokebox (ala GW90) back to the "as built by Baldwin" length.I leave the balance of the description of GW75's status to those that are more knowledgable.sc 'doc' lewis


Offline
 Profile  
 
 Post subject: Re: Heber Valley #75 Rebuild
PostPosted: Wed Nov 30, 2005 11:37 am 

Joined: Thu Jul 07, 2005 4:31 pm
Posts: 69
What are the problems with #618?Tom von Trott


Offline
 Profile  
 
 Post subject: Re: Heber Valley #75 Rebuild
PostPosted: Wed Nov 30, 2005 1:24 pm 

Joined: Wed Feb 02, 2005 2:13 pm
Posts: 243
[redacted]


Last edited by Christian S. on Fri Feb 28, 2025 10:07 pm, edited 2 times in total.

Offline
 Profile  
 
 Post subject: Re: Heber Valley #75 Rebuild
PostPosted: Wed Nov 30, 2005 1:34 pm 

Joined: Thu Aug 26, 2004 2:53 pm
Posts: 660
If I remember correctly, they went ahead and did the running gear on 75 while they had her in the shop.And Mike mentioned that he's planning to replace the tender tank.JAC


Offline
 Profile  
 
 Post subject: Re: Heber Valley #75 Rebuild
PostPosted: Wed Nov 30, 2005 6:24 pm 

Joined: Sun Aug 22, 2004 11:48 am
Posts: 21
No need to worry, there is not anything terriable wrong with 618. U.P. 618 days are only "number" in that she is nearing the end of her 1472 service days. After the current 1472 service days are consumed, the locomotive must go through a 1472 service inspection, per CFR part 230. I can assure you that 618's life here on the Heber Valley RR will be long lived. As long as Heber Valley RR is operating, 618 will be part of the team. As far as #75 goes, she is going through an extensive 1472 inspection. In addition the the boiler work, she is getting a brand new Tender. The cab is having more than half the steel replaced, only a little more than just the roof will be orginal (if you want to consider the cab as orginal - the current cab was built 100% new in the 1940's). The running gear is having some heavy attension as well. Boxes, crown brasses, journals, spring rigging pins and bushings, lead truck journals, new liner in bottom of smokebox, smokebox front door ring, and yes - we did cut the forward 18 inches off the smokebox, new tender wheels, completely new air brake system...the list goes on. We would like to have the locomotive out running sometime in later 2006. The date is not cast in stone, you cannot ever predict what other "hot projects" may fall into your lap that need attention. As "Doc" Lewis stated, 75 is on the front burner in the shop and all time that is allowed is being put forth into #75.I hope this helps answer some questions.Michael ManwillerCheif Mechanical OfficerHeber Valley Railroad


Offline
 Profile  
 
 Post subject: Re: Heber Valley #75 Rebuild
PostPosted: Wed Nov 30, 2005 10:41 pm 

Joined: Wed Feb 02, 2005 2:13 pm
Posts: 243
[redacted]


Last edited by Christian S. on Fri Feb 28, 2025 10:07 pm, edited 2 times in total.

Offline
 Profile  
 
 Post subject: 75 w/ shorter smokebox
PostPosted: Fri Dec 02, 2005 1:23 am 

Joined: Sun Aug 22, 2004 9:35 am
Posts: 8139
Location: Wilton, NY
Here's a 1935 Otto Perry photo of the 75 with the pre-lignite smokebox:http://photoswest.org/cgi-bin/imager?00012095+OP-12095


Offline
 Profile  
 
 Post subject: Re: Heber Valley #75 Rebuild
PostPosted: Sat Dec 03, 2005 7:04 pm 

Joined: Fri Jun 10, 2005 9:07 pm
Posts: 81
Location: MA
Mr. Manwiller,You said #75 is getting new brake equipment? Does that mean conversion to a modern 26L type system or just having her original brake equipment replaced with a set which has been overhauled?Regards,Trevor H.


Offline
 Profile  
 
 Post subject: Re: Heber Valley #75 Rebuild
PostPosted: Mon Dec 05, 2005 3:29 pm 

Joined: Sun Aug 22, 2004 11:48 am
Posts: 21
The new brake system will be a 6ET. Te old system was a G-6 automatic with a strait air valve for the independant. Here at Heber we have enough spare parts to build a complete new 6ET system. While a 26L is nice and easy to work with. The 6ET will work just fine for this operation. The rest of the equipment here is currently so equiped. By standardizing what is already here and using what already exists on the shelf, there is no need to carry additional items that are only unigue to one piece of equipment.


Offline
 Profile  
 
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 10 posts ] 

All times are UTC - 5 hours [ DST ]


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to: