Railway Preservation News
https://www.rypn.org/forums/

WW&F Ry #9 Boiler Constuction at Boothbay Railway
https://www.rypn.org/forums/viewtopic.php?f=1&t=21113
Page 1 of 1

Author:  Brian Fanslau [ Sun Aug 06, 2006 8:58 pm ]
Post subject:  WW&F Ry #9 Boiler Constuction at Boothbay Railway

Here are 3 photos of the new boiler for WW&F Ry #9, ex Sandy River #5. We have had many people asking so I figured I post a few.

The design was completed and reviewed by our inspector about 3 months ago. We have tacked the barrel courses, upper wrapper and the drilled side sheets (yes, this is a key hole boiler). Next, will be the instilation of the flanged throat sheet and the backhead. Also, the crown sheet has been flanged and drilled for stay holes. If anyone is in the Boothbay Maine area, please stop by and check in on the progress. Once the operating season is over in October, we look forward to putting most of our time in completing the boiler. I will post more photos as we progress along.

Image

Image

Image

http://www.railwayvillage.org

Author:  Justin Franz [ Sun Aug 06, 2006 11:13 pm ]
Post subject:  Re: WW&F Ry #9 Boiler Constuction at Boothbay Railway

That's great news, thanks for posting the photographs. I always try to put a little time in volunteering down in Alna, but I just never get down there enough.

Defiantly one of the success stories of rail preservation - any historic preservation for that matter.

-Justin Franz

Author:  Stephen Hussar [ Tue Aug 08, 2006 9:13 am ]
Post subject:  Re: WW&F Ry #9 Boiler Constuction at Boothbay Railway

Awesome, Brian -- thanks for posting the pictures!

Author:  softwerkslex [ Thu Aug 10, 2006 10:22 pm ]
Post subject:  Re: WW&F Ry #9 Boiler Constuction at Boothbay Railway

What is a "key hole" boiler?

Author:  Stephen Hussar [ Mon Aug 14, 2006 9:44 am ]
Post subject:  Re: WW&F Ry #9 Boiler Constuction at Boothbay Railway

I am sure others can describe it better, but "keyhole" refers to the shape, like an antique keyhole. If you were standing in the cab looking at the backhead, the roundness of the rear course is slightly wider than the sides of the firebox -- thus the keyhole idea. Sorry couldn't find a better picture to illustrate...
Image

Author:  Stephen Hussar [ Tue Dec 19, 2006 2:21 pm ]
Post subject:  Re: WW&F Ry #9 Boiler Construction at Boothbay Railway

More progress on the new boiler for WW&F No 9. Yesterday hot-forming of the backhead took place in the shop at Boothbay. It is a thing of beauty!

Image

Author:  Stephen Hussar [ Wed Dec 20, 2006 8:01 am ]
Post subject:  Re: WW&F Ry #9 Boiler Construction

One more from Monday with the insulation removed for photos.

Using a flashlight and mirror, Jason Lamontagne checks the fit of the backhead to the die.
Image

Page 1 of 1 All times are UTC - 5 hours [ DST ]
Powered by phpBB © 2000, 2002, 2005, 2007 phpBB Group
http://www.phpbb.com/