It is currently Sun Aug 30, 2026 1:36 pm

All times are UTC - 5 hours [ DST ]




Post new topic Reply to topic  [ 6 posts ] 
Author Message
 Post subject: NKP PA-1 #190
PostPosted: Thu Nov 23, 2006 1:36 am 

Joined: Mon Oct 11, 2004 10:51 pm
Posts: 52
Location: Wilmington, DE
Hello everyone. I was just looking at Doyle McCormack's PA-1 #190 site, and was wondering... is there a projected date the #190 will return to service? The last update was January 2006. I know I'm kind of out of the loop, so if she's complete and I just haven't realized this, my apologies. Also, I'm not complaining about the pace, just curious as to how close she is to being done. I'm a steam guy, but I have to admit the #190 is looking sharp! Thanks in advance for the info. Happy Thanksgiving. Seth

_________________
I have come not to call the righteous, but sinners to repentance. -- Luke 5:32

I tell you the truth, whoever hears My word and believes Him who sent Me has eternal life and will not be condemned; he has crossed over from death to life. -- John 5:24


Offline
 Profile  
 
 Post subject: Re: NKP PA-1 #190
PostPosted: Thu Nov 23, 2006 2:19 am 

Joined: Mon Aug 23, 2004 8:44 am
Posts: 741
Location: Salt Lake City, Utah
I've wondered about the progress of #190 myself. It seems like Doyle's been playing things pretty close to the vest since Brooklyn Roundhouse was broken into and #190 vandalized earlier this year. Cursed wire thieves!


Offline
 Profile  
 
 Post subject: Re: NKP PA-1 #190
PostPosted: Thu Nov 23, 2006 3:46 am 

Joined: Sun Aug 22, 2004 1:42 am
Posts: 39
Location: Seattle,WA
Last I've heard is that the 190 was turned around earlier this year and work has begun on the fireman's side panels and related bodywork.

"Smokebox" should be able to chime in and provide an further update, as I haven't been able to make it down this year, so I've been a little out of the loop regarding somethings.

Daniel


Offline
 Profile  
 
 Post subject: Re: NKP PA-1 #190
PostPosted: Thu Nov 23, 2006 10:30 am 

Joined: Sun Aug 22, 2004 11:26 am
Posts: 4773
Location: Maine
While not Doyle's locomotive, what is the status of the "little sister", ex-LIRR, ex-BN, ex-SP&S, FA1 outside the roundhouse?

_________________
"It's only impossible until it's done." -Nelson Mandela


Offline
 Profile  
 
 Post subject: Re: NKP PA-1 #190
PostPosted: Fri Nov 24, 2006 7:38 am 

Joined: Sat Aug 21, 2004 10:52 pm
Posts: 162
Location: Greenwich, NY
Oh dear....I must have missed that bit of news.....What exactly did the vandals do, and were they caught?


Offline
 Profile  
 
 Post subject: Re: NKP PA-1 #190
PostPosted: Sat Nov 25, 2006 12:04 am 

Joined: Wed Dec 14, 2005 10:09 am
Posts: 7
As far as the break in, a number of traction motor cables were stolen, and some were cut from the engine. One alledged perpetrator has been arrested.

Progress on the 190 to this point;

Panels on both sides are in place, and most of the body work is done. One side is lettered, and painted.

Some hatches for the roof have to be made, as do the grilles on the sides. Doors need to be fabricated, and glass installed.

The prime mover has had a power assembly replaced, and two heads need to be installed. the air compressor and cooling fan drive need to be mounted.

The trucks have been needle gunned and one side painted

A lot of needle gunning and painting has been done inside of the carbody, and the steam generator water tanks have been converted to storage compartments. The metal floors have had areas replaced.

Traction motor assemblies need to be installed, along with brake piping and rigging.

Assorted wiring and plumbing is still to be done.

The lights and horn work, and, if you stand on the engineer's side, it looks like a completed locomotive.

Much of Doyle's time is spent taking care of the 4449, and working on his F7 and RSD 5, so work proceeds in fits and spurts, though several dedicated volunteers are continually found at work on the unit. A lot of other work has been done, and a list would be quite long, as this was a completely gutted derelict when acquired.

A rough estimate of the time until completion would be 1 to 2 years.

Hope this helps.

Rich


Offline
 Profile  
 
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 6 posts ] 

All times are UTC - 5 hours [ DST ]


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to: