| Railway Preservation News https://www.rypn.org/forums/ |
|
| Want the complete Electricial Drawing a EMD CF7 https://www.rypn.org/forums/viewtopic.php?f=1&t=26692 |
Page 1 of 1 |
| Author: | Owen S. Paulsen [ Sat Nov 22, 2008 3:08 pm ] |
| Post subject: | Want the complete Electricial Drawing a EMD CF7 |
Hi fellow; I work for a fellow that (2) EMD F7A and EMD F7B. What I need is the Complete drawing on Electrical for the EMD CF7 show the follow: Miscellanous Equipment part list, Contactors part list, Relay part list, Governor set, Legend-Remote Headlight Switch, ETC. I have been look for 6 month on/off. I found a book <CF7 Locomotives: From Cleburne to Everywhere> by Cary F. Poole. The book has 7 page by BNSF show the basic wiring. The F7A and F7B that got have 1953 old fall apart insulation an Technology with the 3 pin MU cable and 27 pin MU cable, which prevent for couple the just 27 pin MU only. My E-mail is o.paulsen@sbcglobal.net Home tel (310) 832-4662 Stan |
|
| Page 1 of 1 | All times are UTC - 5 hours [ DST ] |
| Powered by phpBB © 2000, 2002, 2005, 2007 phpBB Group http://www.phpbb.com/ |
|