It is currently Sat Aug 22, 2026 6:42 am

All times are UTC - 5 hours [ DST ]




Post new topic Reply to topic  [ 5 posts ] 
Author Message
 Post subject: GN 4-6-2 #1355
PostPosted: Mon Oct 19, 2009 12:56 pm 

Joined: Fri Aug 27, 2004 7:57 am
Posts: 2598
Location: Faulkland, Delaware
Here is a recent shot of #1355, a fantastic cosmetic restoration done on a steamer with a Belpair boiler. I bet it cost a lot less than $350,000.

http://rrpicturearchives.net/showPictur ... id=1801516

_________________
Tom Gears
Wilmington, DE

Maybe it won't work out. But maybe seeing if it does will be the best adventure ever.


Offline
 Profile  
 
 Post subject: Re: GN 4-6-2 #1355
PostPosted: Mon Oct 19, 2009 1:31 pm 

Joined: Mon May 22, 2006 7:42 pm
Posts: 148
Location: Newark, Delaware
Gotta ask. How did the boiler construction, design, specifications, etc of GN compare to the PRR. If GN 1355 were to be brought back to life, would it have the same issues as PRR 1361?

And I really do not want to revisit the 1361 overhaul, I'd just like to compare notes on PRR and GN practices with similar firebox/boiler design.

Tom


Offline
 Profile  
 
 Post subject: Re: GN 4-6-2 #1355
PostPosted: Mon Oct 19, 2009 2:01 pm 

Joined: Thu Apr 14, 2005 9:34 pm
Posts: 2836
Location: Copenhagen, Denmark
Quote:
Here is a recent shot of #1355, a fantastic cosmetic restoration done on a steamer with a Belpair boiler. I bet it cost a lot less than $350,000.


There has been a lot of grief over the Lindbergh Atlantic restoration, but a recent news item quoted the labor hours at 6300 labor hours. That works out to about $55 an hour, without allowing for materials, tools, and insurance. After allowing for taxes and benefits, I am guessing the wage is $20/hour. That seems about right to me.

The labor hour figure represents about 3 full time employees for a year. Is that appropriate for the task list?

It costs $90 for a man to visit my house with a big air compressor to blow out the sprinkler lines for the winter. It takes about 45 minutes.

_________________
Steven Harrod
Lektor
Danmarks Tekniske Universitet


Offline
 Profile  
 
 Post subject: Re: GN 4-6-2 #1355
PostPosted: Mon Oct 19, 2009 3:42 pm 

Joined: Tue Aug 02, 2005 1:25 pm
Posts: 6482
Tom Parkins wrote:
Gotta ask. How did the boiler construction, design, specifications, etc of GN compare to the PRR. If GN 1355 were to be brought back to life, would it have the same issues as PRR 1361?

And I really do not want to revisit the 1361 overhaul, I'd just like to compare notes on PRR and GN practices with similar firebox/boiler design.

Tom


Tom -

As I recall, the original plans of the Siouxland Historical Railroad Association (SHRA) was to restore the 4-6-2 to active service. Later they secured the old Milwaukee Road roundhouse there in Sioux City as a home for the restoration. Somewhere along the line, the goal changed to just a cosmetic restoration. I don't know whether the reason was because of some mechanical problem with the 1355 or whether the cost to restore her was just unreachable for the group. Maybe someone from SHRA can give us the lowdown.

Les


Offline
 Profile  
 
 Post subject: Re: GN 4-6-2 #1355
PostPosted: Mon Oct 19, 2009 5:36 pm 

Joined: Sun Aug 22, 2004 11:26 am
Posts: 4773
Location: Maine
Hopefully she'll be stored under cover. Doesn't the loco look great, posed on the turntable? All she really needs is a plume of pressurized steam coming from the generator. Wonderful restoration.

_________________
"It's only impossible until it's done." -Nelson Mandela


Offline
 Profile  
 
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 5 posts ] 

All times are UTC - 5 hours [ DST ]


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to: