 Post subject: Investigation into a boiler incident on the Kirklees Light R
PostPosted: Fri Sep 16, 2011 10:39 pm 

Joined: Wed Aug 25, 2004 11:16 am
Posts: 767
taken from

http://www.raib.gov.uk/publications/cur ... rklees.cfm

Robby Peartree

Investigation into a boiler incident on the Kirklees Light Railway, 3 July 2011

At 12:09 hrs the second passenger train of the day on the 15 inch gauge Kirklees Light Railway stopped a short distance from the terminus at Shelley with low boiler water level. The injectors were unable to maintain the level of water in the boiler which dropped below the bottom of the gauge glasses and the fusible plug melted. The train crew and the railway’s responsible officer were unable to diagnose the problem and, after some delay, the fire was dropped. By the time that the decision was made to drop the fire, parts of the firebox and boiler had been exposed to the fire without water behind them for several minutes. During this time there was an increasing risk of a dangerous failure of the boiler.

The RAIB’s preliminary examination has found that the flow of water to the boiler from the larger of the two injectors was restricted owing to a valve between the injector and the boiler being nearly closed. The melting of the fusible plug in the firebox was not noticed by the train crew.

The investigation will examine the sequence of events leading up to the incident, the way in which the incident was managed, the railway’s procedures for locomotive maintenance and preparation and its system of training and assessment of operational staff.

The RAIB has issued safety advice reminding operators of steam locomotives of the need to ensure that they have identified the risks associated with boiler malfunction and have suitable processes in place, and briefed, for managing them. This advice covers the need for preparation and routine inspection, and in particular, checking the correct operation of methods of feeding the boiler with water. It also urges operators to review the adequacy of their arrangements for ensuring that the crews of locomotives are competent to recognise signs of low water and are aware of the subsequent actions to be taken.

The RAIB’s investigation is independent of any investigations by the safety authority (the Office of Rail Regulation).

The RAIB will publish a report, including any recommendations to improve safety, at the conclusion of its investigation. This report will be available on the RAIB website.

You can subscribe to automated emails notifying you when the RAIB publishes its reports. Click to subscribe.


Offline
 Profile  
 
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 1 post ] 

All times are UTC - 5 hours [ DST ]


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to: