Author:  car57 [ Tue Aug 26, 2014 11:26 pm ]
Post subject:  Well cant do anymore 2516 gets moved to Cheyenne tomorrow

After staggering amounts of frantic activity, in between normal work she is as ready as she can be for the big day tomorrow. With the help of my volunteer Bob Jones we even managed to get a working air system holding 80lbs wth a gauge above the conductors desk and operating monkey tail back up whistle, the kids should love that !

Mike Pannell

Attachments:
20140826_141337_resized[1].jpg
20140826_141337_resized[1].jpg [ 75.75 KiB | Viewed 2950 times ]
20140826_141328_resized[1].jpg
20140826_141328_resized[1].jpg [ 66.92 KiB | Viewed 2950 times ]
20140826_141259_resized[1].jpg
20140826_141259_resized[1].jpg [ 53.43 KiB | Viewed 2950 times ]

Author:  J3a-614 [ Wed Aug 27, 2014 6:20 am ]
Post subject:  Re: Well cant do anymore 2516 gets moved to Cheyenne tomorro

car57 wrote:
With the help of my volunteer Bob Jones we even managed to get a working air system holding 80lbs wth a gauge above the conductors desk and operating monkey tail back up whistle, the kids should love that !

Mike Pannell


Oh, yes, the kids will love it--but you may hate it at the end of the day!!

Congratulations on the work and the new day!