Railway Preservation News
https://www.rypn.org/forums/

BO Tower to close, Kalamazoo, MI
https://www.rypn.org/forums/viewtopic.php?f=1&t=39843
Page 1 of 1

Author:  TrainWatcher [ Thu Sep 22, 2016 9:35 pm ]
Post subject:  BO Tower to close, Kalamazoo, MI

Effective October 20th, NS and Amtrak will shutdown the LAST operational manned NYC and wooden construction interlocking tower in Kalamazoo, MI. This marks the end of years of tradition at Kalamazoo and the remarkable history of BO Tower. The Saxby interlocking machine was silenced 2 years ago, and the interlocker was converted to push button operation. Upon closure, Amtrak will take over dispatching duties on the former NYC mainline from Dearborn, MI to Porter, IN creating a new Amtrak corridor.

Author:  Les Beckman [ Thu Sep 22, 2016 9:54 pm ]
Post subject:  Re: BO Tower to close, Kalamazoo, MI

R.I.P. BO Tower!



Les

Author:  Catalpa [ Fri Sep 23, 2016 6:17 am ]
Post subject:  Re: BO Tower to close, Kalamazoo, MI

Time marches on. Have good memories of hanging out at BO tower, when I was in grad school, back in the late 60s. I met some dedicated and competent employees, and learned a great deal about railroading operations which served me well, over the years. Watching the early days of Penn Central, with the attempted cross utilization of NYC and PRR power, was at times like watching the Keystone Cops. Long ago and far away....

Author:  Richard Glueck [ Fri Sep 23, 2016 5:16 pm ]
Post subject:  Re: BO Tower to close, Kalamazoo, MI

BO is being raised? That really stinks.

Author:  TrainWatcher [ Sat Sep 24, 2016 8:55 am ]
Post subject:  Re: BO Tower to close, Kalamazoo, MI

Actually, no. MDOT is working with the Henry Ford Museum to bring the structure and Saxby machine to Greenfield Village for eventual display to the public.

Author:  Les Beckman [ Sat Sep 24, 2016 8:58 pm ]
Post subject:  Re: BO Tower to close, Kalamazoo, MI

WOW! Three cheers for the Henry Ford! Hope they get it done. And I will take back my earlier "Rest in Peace" for BO Tower.


Les

Author:  TrainWatcher [ Mon Oct 17, 2016 1:21 pm ]
Post subject:  Re: BO Tower to close, Kalamazoo, MI

UPDATE: Last shift is 3rd Trick on October 25th. This makes the tower 102 years and 23 Days old when it closes. The interworkings, model board, and all necessary interlocking material besides the Saxby machine has been sent to the Henry Ford for its safe keeping until the tower is moved.

Page 1 of 1 All times are UTC - 5 hours [ DST ]
Powered by phpBB © 2000, 2002, 2005, 2007 phpBB Group
http://www.phpbb.com/