PostPosted: Sat Nov 05, 2022 10:28 pm 

Joined: Mon Mar 01, 2021 10:03 pm
Posts: 94
Location: Southeast PA
I read a caption of a picture taken in Bryn Mawr Pa in last month's Railplace Newsmagazine which stated the original 1915 catenary from Philadelphia to Paoli has numbered days and will be replaced in the near future which would move the transmission overbuild onto this ROW (and remove it from the old Trenton Cutoff).

Any truth to this? I know Amtrak has been trying to do this for years (decades), but it falls through everytime. Does someone know something that I don't?


Offline
 Profile  
 
 Post subject: Re: Old PRR Main Line Catenary
PostPosted: Sun Nov 06, 2022 3:16 pm 

Joined: Fri Dec 22, 2017 6:47 pm
Posts: 1546
Location: Philadelphia, PA
They're working on it. The original 1915 AC electrification to Paoli used 44 kV transmission lines. That is still in use probably 48 kV now. Contact wire has been a nominal 11 or 12 kV.

The 138 kV transmission line from Safe Harbor goes onto the PRR Trenton Branch to Plymouth Meeting (formerly to Morrisville) and from Mogees onto the PRR Schuylkill Branch to "ZOO" and to 30th St. Part of this is now NS, part a Montgomery County Rail Trail and part SEPTA.

The plan is to move the 138 kV line to new cat poles on the Main Line and retire the 44/48 kV hardware dating to 1915. Contact wire would move to the new cat poles as well.

When will it happen? It should be sooner than later. The 107 year old poles and equipment keep getting older.

Note: do not confuse the Reading's Norristown Branch, now SEPTA, with the parallel PRR Schuylkill Branch. RDG/SEPTA and PRR/AMTRAK-SEPTA both use 12 kV 25 Hz traction power but they are from different sources between the ex-PRR and ex-RDG sides and the two sides are not necessarily in phase with each other.

Phil Mulligan


Offline
 Profile  
 
 Post subject: Re: Old PRR Main Line Catenary
PostPosted: Sun Nov 06, 2022 3:26 pm 

Joined: Wed Jun 29, 2016 11:58 am
Posts: 327
EJ Berry wrote:
When will it happen? It should be sooner than later. The 107 year old poles and equipment keep getting older.

Not to mention the catenary pole hardware on the ex PRR's Schuylkill Branch will need some serious cash if it's not replaced one way or the other as well.

Brian


Offline
 Profile  
 
 Post subject: Re: Old PRR Main Line Catenary
PostPosted: Tue Nov 08, 2022 7:48 pm 

Joined: Mon Mar 01, 2021 10:03 pm
Posts: 94
Location: Southeast PA
I know it's bound to be replaced someday - just not sure if it's "on the docket" right now.

The old money in that area has helped block it before.

It's not designed as a transmission corridor so I hope they can just rebuild as-is.

But... if the time is coming, I hope to know before they break ground.


Offline
 Profile  
 
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 4 posts ] 

All times are UTC - 5 hours [ DST ]


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to: