Railway Preservation News
https://www.rypn.org/forums/

Keith Rucker Maintains Vulcan 0-4-0
https://www.rypn.org/forums/viewtopic.php?f=1&t=49271
Page 1 of 1

Author:  joe6167 [ Mon Jun 29, 2026 8:44 am ]
Post subject:  Keith Rucker Maintains Vulcan 0-4-0

Keith Rucker has just completed rebuilding the Stoker Engine for NC&StL 576. It's taken about 7 years for various reasons... but he's been documenting every step of the way.

Here's the latest video in the series:

https://www.youtube.com/watch?v=cDM7OtKdSRQ

And the playlist:

https://www.youtube.com/playlist?list=P ... 9PrmYIP8Fo

He also helps take care of a Vulcan 0-4-0 at the Georgia Museum of Agriculture, which is currently getting it's pistons and cylinders redone.

Author:  Ed Kapuscinski [ Tue Jun 30, 2026 11:45 am ]
Post subject:  Re: Stoker Engine Rebuild

Keith is a national treasure.

That project is such a fantastic example of Yak Shaving too. I think he ended up buying and restoring and entire machine to do it.

Author:  joe6167 [ Fri Jul 03, 2026 7:45 am ]
Post subject:  Re: Stoker Engine Rebuild

Sleeving the cylinders on the 0-4-0 Vulcan.

With enough liquid nitrogen, the sleeve just slides right in!

https://www.youtube.com/watch?v=oLEMVmWxZ0s

Author:  John Risley [ Sat Jul 04, 2026 9:45 am ]
Post subject:  Re: Stoker Engine Rebuild

Thanks for posting the video of the sleeve fit. It is amazing how liquid nitrogen works for interference fits. We slipped an axel into a wheel center using Liquid Nitrogen and heat on the wheel center. Worked slick and we all breathed a sigh of relief then when we were done. Think it was about .007 interference. Have a great 4th. John.

Author:  PMC [ Sun Jul 05, 2026 4:28 pm ]
Post subject:  Re: Stoker Engine Rebuild

It's interesting that at the end of the last video he wearily offered his opinion that this stoker engine was so worn out that, back in the age of steam, it likely would have been sent to scrap and replaced with a new one. He may be right, I'll bet near the end NC&StL was running its steam until it dropped.

Author:  mmi16 [ Thu Jul 09, 2026 1:16 pm ]
Post subject:  Re: Stoker Engine Rebuild

PMC wrote:
It's interesting that at the end of the last video he wearily offered his opinion that this stoker engine was so worn out that, back in the age of steam, it likely would have been sent to scrap and replaced with a new one. He may be right, I'll bet near the end NC&StL was running its steam until it dropped.


Mechanical Departments of the carriers knew steam was ending long before the last engines were removed from service and saved all the budget money available to them by only doing the minimum level of work necessary to get an engine back out on line of road - thus everything was left wear out, wear out beyond normal replacement values.

Author:  joe6167 [ Fri Jul 31, 2026 1:55 pm ]
Post subject:  Re: Stoker Engine Rebuild

At the Georgia Museum of Agriculture, they did manage to get their 0-4-0 Vulcan running for the 4th of July, however they quickly noticed that the steam coming up the stack was pretty wet.

https://www.youtube.com/watch?v=fCjZHkjJ8Xk

On suspicious of a leaking dry pipe, they stripped the engine down to the boiler to start investigating the problem.

https://www.youtube.com/watch?v=l2YvNqcS5kM

Here Keith starts his hydro test. Simply filling up the dry pipe and waiting, without even having to apply pressure was sufficient to prove that the drypipe does in fact have a leak.

https://www.youtube.com/watch?v=l6uSNdMExv8

Up next, the company that built the boiler is going to come take a look at it. Keith figures they'll have to cut the dry pipe out of the front tube sheet, replace it, and weld it back up.

Author:  joe6167 [ Mon Aug 10, 2026 8:52 am ]
Post subject:  Re: Keith Rucker Maintains Vulcan 0-4-0

A few more updates on the Vulcan:

Installing a new dry pipe:

https://www.youtube.com/watch?v=ajk-07C8QJw

Here Keith is using a laser cleaner to remove rust and old paint off the locomotive. What insane devices! The needle gun is dead!

https://www.youtube.com/watch?v=JeTCod16h0c

Here's Keith introducing the new laser cleaner:

https://www.youtube.com/watch?v=xS2KxTut63g

Author:  joe6167 [ Fri Aug 21, 2026 6:09 pm ]
Post subject:  Re: Keith Rucker Maintains Vulcan 0-4-0

Machining and fitting crosshead gibs:

https://www.youtube.com/watch?v=6AYF7HdHEMY

Author:  kew [ Tue Sep 08, 2026 1:41 am ]
Post subject:  Re: Keith Rucker Maintains Vulcan 0-4-0

And another video, https://www.youtube.com/watch?v=z9TWJ7gEl3I

Anyone else had experience of these laser cleaners for preservation tasks like rust, grease or paint removal (from both steel and timber)? Are they worth it? Now I mean - I'm sure they will be very useful if they get cheaper.

Author:  Bob D. [ Thu Sep 24, 2026 12:36 pm ]
Post subject:  Re: Keith Rucker Maintains Vulcan 0-4-0

New England Steam Corp recently purchased a 2000watt laser cleaning system to aid the restoration of MEC 470. After several work sessions using it I can say this equipment is a real game changer in metal prep. Truly amazing the job it does. Going to be pretty hard to fire up the needle guns again!

Author:  joe6167 [ Thu Nov 05, 2026 6:40 pm ]
Post subject:  Re: Keith Rucker Maintains Vulcan 0-4-0

In the latest update Keith installs the repaired saddle tank.

https://www.youtube.com/watch?v=-dE5ONOGiQM

Author:  mmi16 [ Thu Nov 12, 2026 1:08 am ]
Post subject:  Re: Stoker Engine Rebuild

PMC wrote:
It's interesting that at the end of the last video he wearily offered his opinion that this stoker engine was so worn out that, back in the age of steam, it likely would have been sent to scrap and replaced with a new one. He may be right, I'll bet near the end NC&StL was running its steam until it dropped.

At the end of steam - every carrier was only band-aid repairing steam - fix it enough to get it back out on the Main Line to fail and get band-aided again.

Author:  joe6167 [ Fri Nov 20, 2026 12:57 pm ]
Post subject:  Re: Keith Rucker Maintains Vulcan 0-4-0

Latest update from Keith:

https://www.youtube.com/watch?v=HRm_uKJwsDA

This is an incredible video. They finally got the engine up and running after:
-Rebuilding the pistons, valves, side rods
-Replacing the dry pipe and overhauling the throttle
-Repairing the saddle tank
-Repairing the tender

The only things that haven't been done so far are, the wheels and valve gear, which they plan on redoing next year. They've got a new cab on order, but it hasn't arrived yet.

What's really valuable here is Keith's assessment of the locomotive before and after all the work they did. He talks about how the locomotive feels a bit tight on its first runs, describing how it used to behave when it was much looser.

Page 1 of 1 All times are UTC - 5 hours [ DST ]
Powered by phpBB © 2000, 2002, 2005, 2007 phpBB Group
http://www.phpbb.com/