Railway Preservation News
https://www.rypn.org/forums/

Fort Wayne Open House *PIC*
https://www.rypn.org/forums/viewtopic.php?f=1&t=6668
Page 1 of 1

Author:  Tim Boshart [ Sat Aug 16, 2003 8:49 pm ]
Post subject:  Fort Wayne Open House *PIC*

Just got back from the open house at the Fort Wayne Railroad Historical Society. Here is a picture of NKP 765 as it appears today.

http://timlinux.goshen.edu/
Image
timsb@goshen.edu

Author:  Jim Fitzgerald [ Sun Aug 17, 2003 7:06 pm ]
Post subject:  Re: Fort Wayne Open House

Tim, thanks for posting that. Can you tell us more, such as are all the paint-highlighted staybolts those that have been replaced or deemed OK? Are the drive wheels there or still at TVRM? Have the tubes and flues been completed? Just overly curious.


fitzrr@pioneer.net

Author:  Jim Tighe [ Sun Aug 17, 2003 9:19 pm ]
Post subject:  Re: Fort Wayne Open House

> Tim, thanks for posting that. Can you tell
> us more, such as are all the
> paint-highlighted staybolts those that have
> been replaced or deemed OK? Are the drive
> wheels there or still at TVRM? Have the
> tubes and flues been completed? Just overly
> curious.

I cannot answer the staybolt q., but can tell you that the new flues and tubes have been made, there are new front and rear flue/tube sheets, and a new cab is being made. The tender is also getting extensive work done. Check the 765 site for more info. Jim Tighe, Wapak, OH.

justighe@bright.net

Author:  Tim Boshart [ Sun Aug 17, 2003 9:51 pm ]
Post subject:  Re: Fort Wayne Open House

> Tim, thanks for posting that. Can you tell
> us more, such as are all the
> paint-highlighted staybolts those that have
> been replaced or deemed OK? Are the drive
> wheels there or still at TVRM? Have the
> tubes and flues been completed? Just overly
> curious.

Here's the link for the FWRHS home page. They have a page detailing what has been done on the restoration. About the only news not on the page is that the wheels are done but are being stored down at the TVRM until they are ready to be put back under the engine.


FWRHS Home Page
timsb@goshen.edu

Author:  Glenn Brendel [ Mon Aug 18, 2003 6:20 pm ]
Post subject:  Re: Fort Wayne Open House

> Tim, thanks for posting that. Can you tell
> us more, such as are all the
> paint-highlighted staybolts those that have
> been replaced or deemed OK? Are the drive
> wheels there or still at TVRM? Have the
> tubes and flues been completed? Just overly
> curious.

The white paint indicates any work required on those items is completed. Yellow means work still in progress. Red indicates a item to be removed and replaced (mostly studs and a few caps.)

Virtually all of the boiler work, including replacement syphons, tube sheet(s) replacement, various firebox sheet(s) replacement (corners, throat sheet and a complete side sheet), flues and tubes is complete. The superheater units have been rebuilt and are ready for installation after the hydro.

We are probably a couple of work weeks away from a first hydro.

http://765.org
nkpshop@aol.com

Author:  John S [ Fri Aug 22, 2003 10:19 am ]
Post subject:  Re: Fort Wayne Open House

Once 765 is fired up, is there anywhere to run her?

Page 1 of 1 All times are UTC - 5 hours [ DST ]