It is currently Sun Aug 23, 2026 12:35 am

All times are UTC - 5 hours [ DST ]




Post new topic Reply to topic  [ 6 posts ] 
Author Message
 Post subject: Fort Wayne Open House *PIC*
PostPosted: Sat Aug 16, 2003 8:49 pm 

Just got back from the open house at the Fort Wayne Railroad Historical Society. Here is a picture of NKP 765 as it appears today.

http://timlinux.goshen.edu/
Image
timsb@goshen.edu


  
 
 Post subject: Re: Fort Wayne Open House
PostPosted: Sun Aug 17, 2003 7:06 pm 

Tim, thanks for posting that. Can you tell us more, such as are all the paint-highlighted staybolts those that have been replaced or deemed OK? Are the drive wheels there or still at TVRM? Have the tubes and flues been completed? Just overly curious.


fitzrr@pioneer.net


  
 
 Post subject: Re: Fort Wayne Open House
PostPosted: Sun Aug 17, 2003 9:19 pm 

> Tim, thanks for posting that. Can you tell
> us more, such as are all the
> paint-highlighted staybolts those that have
> been replaced or deemed OK? Are the drive
> wheels there or still at TVRM? Have the
> tubes and flues been completed? Just overly
> curious.

I cannot answer the staybolt q., but can tell you that the new flues and tubes have been made, there are new front and rear flue/tube sheets, and a new cab is being made. The tender is also getting extensive work done. Check the 765 site for more info. Jim Tighe, Wapak, OH.

justighe@bright.net


  
 
 Post subject: Re: Fort Wayne Open House
PostPosted: Sun Aug 17, 2003 9:51 pm 

> Tim, thanks for posting that. Can you tell
> us more, such as are all the
> paint-highlighted staybolts those that have
> been replaced or deemed OK? Are the drive
> wheels there or still at TVRM? Have the
> tubes and flues been completed? Just overly
> curious.

Here's the link for the FWRHS home page. They have a page detailing what has been done on the restoration. About the only news not on the page is that the wheels are done but are being stored down at the TVRM until they are ready to be put back under the engine.


FWRHS Home Page
timsb@goshen.edu


  
 
 Post subject: Re: Fort Wayne Open House
PostPosted: Mon Aug 18, 2003 6:20 pm 

> Tim, thanks for posting that. Can you tell
> us more, such as are all the
> paint-highlighted staybolts those that have
> been replaced or deemed OK? Are the drive
> wheels there or still at TVRM? Have the
> tubes and flues been completed? Just overly
> curious.

The white paint indicates any work required on those items is completed. Yellow means work still in progress. Red indicates a item to be removed and replaced (mostly studs and a few caps.)

Virtually all of the boiler work, including replacement syphons, tube sheet(s) replacement, various firebox sheet(s) replacement (corners, throat sheet and a complete side sheet), flues and tubes is complete. The superheater units have been rebuilt and are ready for installation after the hydro.

We are probably a couple of work weeks away from a first hydro.

http://765.org
nkpshop@aol.com


  
 
 Post subject: Re: Fort Wayne Open House
PostPosted: Fri Aug 22, 2003 10:19 am 

Once 765 is fired up, is there anywhere to run her?


  
 
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 6 posts ] 

All times are UTC - 5 hours [ DST ]


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to: