It is currently Wed Sep 30, 2026 7:09 am

All times are UTC - 5 hours [ DST ]




Post new topic Reply to topic  [ 6 posts ] 
Author Message
 Post subject: PVC lagging
PostPosted: Sun Apr 18, 2004 9:07 pm 

Just some photos showing the use of PVC pipe under the boiler jacket of B&M 4-4-0 494, to replace the former asbestos lagging.

http://cvrr.railfan.net/UVRIDpages/Work%20Photo.htm
ryarger@rypn.org


  
 
 Post subject: Re: PVC lagging
PostPosted: Sun Apr 18, 2004 9:56 pm 

> Just some photos showing the use of PVC pipe
> under the boiler jacket of B&M 4-4-0
> 494, to replace the former asbestos lagging.

It won't insulate as well, but could be connected to form a clever boiler water preheater. I'm surprised it will withstad the heat without melting.

Mike


mike211@yknet.ca


  
 
 Post subject: Re: PVC lagging
PostPosted: Sun Apr 18, 2004 10:12 pm 

> It won't insulate as well, but could be
> connected to form a clever boiler water
> preheater. I'm surprised it will withstad
> the heat without melting.

It looks to me this is only a cosmetic restoration. The pipe is only to hold the jacketing in position, not for insulation purposes.


  
 
 Post subject: Re: PVC lagging
PostPosted: Sun Apr 18, 2004 11:57 pm 

> It looks to me this is only a cosmetic
> restoration. The pipe is only to hold the
> jacketing in position, not for insulation
> purposes.
I work on the NYC 6721 in Utica,NY and we used
1" poly styrene foam board cut into 2" wide stips
under our new jacket and it worked out well.
Sorry,I don,t have any pics

dmzlalo@aol.com


  
 
 Post subject: Re: PVC lagging
PostPosted: Mon Apr 19, 2004 9:55 am 

> It looks to me this is only a cosmetic
> restoration. The pipe is only to hold the
> jacketing in position, not for insulation
> purposes.

Soo Line 4-6-2 2713 in Stevens Point, WI was recently restored this way, and looks great. The PVC pipe won't hold water, and has minimum contact with the boiler shell, so should avoid pitting problems. In addition to the PVC pipe, the group used what appeares to be pre-colored black PVC sheet for the jacket. The lower edge of the jacket ends at an angle flange attached to the top of the running board, leaving the entire lower portion of the shell open to drain, and the rest free to ventilate. In all, a good looking cosmetic restoration that is sensitive to preserving the boiler. I'm not associated with the group, but if anyone needs contact info, e-mail me off list.

dstorzek@elnet.com


  
 
 Post subject: Re: PVC lagging *PIC*
PostPosted: Mon Apr 19, 2004 6:52 pm 

> I work on the NYC 6721 in Utica,NY and we
> used
> 1" poly styrene foam board cut into
> 2" wide stips
> under our new jacket and it worked out well.
> Sorry,I don,t have any pics

Here's one, from October 2002...

parkengines.railfan.net
Image
rjenkins@northeasternmaritime.org


  
 
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 6 posts ] 

All times are UTC - 5 hours [ DST ]


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Jump to: