 Post subject: Diamond installations at museums; what are the issues?
PostPosted: Mon Jan 26, 2015 10:03 pm 

Joined: Tue Aug 02, 2005 1:25 pm
Posts: 6471
Last June, on a visit to the Illinois Railway Museum, I ran across a diamond that the museum has put in (see photo). I have mentioned installing a diamond at our museum to be used in conjunction with our interlocking tower. There are those members however, that say that there are too many things that have to be installed besides just ties and spikes. I could understand that thinking IF the diamond was going to be used for high speed and/or heavy duty, as most diamonds were in regular service on common carrier railroads. This of course, would not be the case at our museum, as I don't think the future plans are at IRM with the diamond shown. So my question; are there railroad museums out there that have installed diamonds, and what exactly are the issues with their installation, if any?

Thanks.


Les Beckman (Hoosier Valley Railroad Museum/North Judson, Indiana)


Attachments:
Father's Day June 2014 012.JPG
Father's Day June 2014 012.JPG [ 326.18 KiB | Viewed 10198 times ]
Offline
 Profile  
 
 Post subject: Re: Diamond installations at museums; what are the issues?
PostPosted: Mon Jan 26, 2015 11:53 pm 

Joined: Thu Aug 26, 2004 2:50 pm
Posts: 2815
Location: Northern Illinois
That is the second crossing installed at IRM. If you look at appx. 2 o'clock on this map, you will see the first, which has been in service since the eighties:

http://www.irm.org/tour/propertymap.html

It sees regular service on the streetcar line, with occasional diesel locomotives switching the barns on the other route, I've not been active for a good many years, but as far as I know, it takes no more maintenance than a turnout.

_________________
Dennis Storzek


Offline
 Profile  
 
 Post subject: Re: Diamond installations at museums; what are the issues?
PostPosted: Tue Jan 27, 2015 12:07 am 

Joined: Tue Aug 02, 2005 1:25 pm
Posts: 6471
Dennis Storzek wrote:
That is the second crossing installed at IRM. If you look at appx. 2 o'clock on this map, you will see the first, which has been in service since the eighties:

http://www.irm.org/tour/propertymap.html

It sees regular service on the streetcar line, with occasional diesel locomotives switching the barns on the other route, I've not been active for a good many years, but as far as I know, it takes no more maintenance than a turnout.


Dennis -

Thanks for your note, and the map of IRM. When I rode CTA 3142 on the streetcar line that day, I didn't even realize that we had gone through a diamond. I noticed the one in the photo because we went next to it, but not through it. From the looks of the other diamond, it has to be somewhat similar (angle-wise) to the one we have at HVRM (photo below). Would be interested in knowing construction particulars in IRM's installation of their two diamonds.

Les


Attachments:
July 12, 2014 at HVRM 003.JPG
July 12, 2014 at HVRM 003.JPG [ 348.88 KiB | Viewed 10048 times ]
Offline
 Profile  
 
 Post subject: Re: Diamond installations at museums; what are the issues?
PostPosted: Tue Jan 27, 2015 12:31 am 

Joined: Fri Dec 03, 2004 9:42 pm
Posts: 2950
Les Beckman wrote:
I have mentioned installing a diamond at our museum to be used in conjunction with our interlocking tower. There are those members however, that say that there are too many things that have to be installed besides just ties and spikes.


Such as what? Are they talking about the interlocking end of things? As for the diamond part, if your crews can build a turnout, they can build a diamond. There are some special plates, just like a turnout (switch) but presumably your diamond includes them.

The only really tricky part is that the alignment of both tracks has to be spot on, or you'll get doglegs or "angle points" entering and leaving the diamond.

For a typical museum speed operation I don't see the problem. I have to admit, I've never installed a diamond on a museum operation, but I have installed a couple on a local shortline, and they weren't a big deal.


Offline
 Profile  
 
 Post subject: Re: Diamond installations at museums; what are the issues?
PostPosted: Tue Jan 27, 2015 1:05 am 

Joined: Mon Aug 23, 2004 3:01 pm
Posts: 1754
Location: SouthEast Pennsylvania
Branford Electric Rwy. Ass'n. - Shore Line Trolley Museum had a new diamond custom build to them in 2 parts, for shipping purposes.. They also bought a used diamond, as a collection of frogs and guard rails, but it hasn't been used, yet.
Delaware Valley Short Line trolley museum in Tansboro, N.J. had 2 almost 90 degree crossings in use in the 1960s, but they were used girder rail.


Offline
 Profile  
 
 Post subject: Re: Diamond installations at museums; what are the issues?
PostPosted: Tue Jan 27, 2015 2:21 am 

Joined: Thu Aug 26, 2004 2:50 pm
Posts: 2815
Location: Northern Illinois
Here is a somewhat foreshortened telephoto view of IRM's first diamond:

http://www.irm.org/gallery/album195/adp

This is looking down the barn lead; the car line runs right to left.

This crossing was built with the one leg curved; came out of the Commonwealth Edison California St. generating plant when it was being dismantled in the early seventies. IIRC it is ASCE 80# rail (8040). The track plan was developed specifically because we had the crossing when a property planning session addressed the fact that we did not have enough "steam road" radius storage buildings.

I'm sure the nattering nabobs of negativism that Les is talking about are citing engineering texts that plainly state that you can't put enough timber under a crossing to adequately support it under HEAVY MAINLINE TRAFFIC, and railroads over the years have put all sorts of steel and concrete structures under mainline crossings to deal with this problem, but hey, we're not running heavy mainline traffic. As I recall, this crossing was placed on the standard IRM yard track construction of the time; sprinkle 6" of bank-run gravel on the grass and lay out the ties. I'm sure it has had numerous lifts over the years to tamp more rock under it, but that's the way all the early museum track was... the longer it's in service, the better it gets. Keep in mind that those diesels you see in the photo, plus the U.P. turbine that is farther west in Yard 5, all had to come in over that crossing, because it's the only way in.

_________________
Dennis Storzek


Offline
 Profile  
 
 Post subject: Re: Diamond installations at museums; what are the issues?
PostPosted: Tue Jan 27, 2015 2:31 am 

Joined: Wed Oct 22, 2008 8:18 pm
Posts: 2226
it seems strange it deadends like that but its part of the future planning at IRM, so there ya goes with the rest of the story.


Offline
 Profile  
 
 Post subject: Re: Diamond installations at museums; what are the issues?
PostPosted: Tue Jan 27, 2015 10:10 am 

Joined: Fri Dec 04, 2009 5:21 pm
Posts: 9
Engineering has nothing to do with it, its smiple matter of man power and priorities.


Offline
 Profile  
 
 Post subject: Re: Diamond installations at museums; what are the issues?
PostPosted: Tue Jan 27, 2015 10:31 am 

Joined: Thu Sep 22, 2011 4:29 pm
Posts: 1899
Location: Youngstown, OH
Yep, looks like it will provide a switching lead for future storage yard 12 and perhaps a bridge over the creek.

_________________
From the desk of Rick Rowlands
inside Conrail caboose 21747


Offline
 Profile  
 
 Post subject: Re: Diamond installations at museums; what are the issues?
PostPosted: Tue Jan 27, 2015 11:05 am 

Joined: Mon Aug 23, 2004 11:38 am
Posts: 54
Location: Parkton, MD
Les,

One of the few concerns might be in respect to any signal system you possibly have at your museum. Crossings like this, just like on a model railroad, short the rails together. If you have a signal system, you need insulated rail joints on all rails with bonded jumpers around the crossing to maintain signal circuit integrity.

There should be some of the track and signals guys that could explain better than I can.

Dave Crow


Offline
 Profile  
 
 Post subject: Re: Diamond installations at museums; what are the issues?
PostPosted: Tue Jan 27, 2015 11:23 am 

Joined: Tue Aug 02, 2005 1:25 pm
Posts: 6471
Cory Bennett wrote:
Engineering has nothing to do with it, its smiple matter of man power and priorities.


Thanks Cory. That's good to hear.


Les


Offline
 Profile  
 
 Post subject: Re: Diamond installations at museums; what are the issues?
PostPosted: Tue Jan 27, 2015 12:42 pm 

Joined: Thu Apr 14, 2005 9:34 pm
Posts: 2824
Location: Copenhagen, Denmark
And of course there is the TRAINS article on this subject this month.

_________________
Steven Harrod
Lektor
Danmarks Tekniske Universitet


Offline
 Profile  
 
 Post subject: Re: Diamond installations at museums; what are the issues?
PostPosted: Tue Jan 27, 2015 1:29 pm 

Joined: Tue Nov 12, 2013 6:45 pm
Posts: 258
Hot Metal wrote:
Yep, looks like it will provide a switching lead for future storage yard 12 and perhaps a bridge over the creek.


A bridge over the creek has to come first, there isn't not enough space to put the switch and still have headroom to clear the switch.

_________________
Restoring MILW X-5000: The Milwaukee Road's Dynamometer car

Restoration website


Offline
 Profile  
 
 Post subject: Re: Diamond installations at museums; what are the issues?
PostPosted: Tue Jan 27, 2015 4:47 pm 

Joined: Thu Nov 22, 2007 5:46 am
Posts: 2611
Location: S.F. Bay Area
dave crow wrote:
One of the few concerns might be in respect to any signal system you possibly have at your museum. Crossings like this, just like on a model railroad, short the rails together. If you have a signal system, you need insulated rail joints on all rails with bonded jumpers around the crossing to maintain signal circuit integrity.

Or, don't insulate the components of the diamond, and simply have insulating joints on all 8 rails entering it. The diamond proper becomes a black-hole in the signal system, but a car is long enough that it'll always have one truck on an approach circuit. Anything too short is going to be MoW equipment or a Birney, and those are too light to reliably shunt anyway. In fact, most MoW equipment insulates the wheels.

Anyway for us at museums, we are vanishingly unlikely to put a diamond out on our "main line". It will certainly be in terminal areas, as at IRM, on our plot of land to solve topological problems of getting tracks into possible carbarn locations.


Offline
 Profile  
 
 Post subject: Re: Diamond installations at museums; what are the issues?
PostPosted: Wed Jan 28, 2015 3:56 pm 

Joined: Wed Jan 28, 2009 4:30 pm
Posts: 210
At the Nevada State Railroad Museum in Carson City we recently replaced two diamonds.
The old diamonds had developed cracks in the web of several rails. Putting in new diamonds alleviated this issue and allowed us to dual gauge the track. Both tracks are on curves.

Despite there had been diamonds there for 20 years (so the ground is stable) and our having tamped rigorously the diamonds still settled. They are built on ¾” plates which sit on wooden ties. All the ties are new as is the ballast. The plates make it difficult to tamp even though they are skeletonized.

Harmer built the diamonds in 2009. We purchased two with an approximate cost of $60K each. They were built in 90# rail, bolted, and plated. They came as kits and we had to assemble them.

Lining and leveling two tracks on a curve and a grade is a tedious but a tenacious man can prevail.

Chris DeWitt


Attachments:
diamond resize-jpg.jpg
diamond resize-jpg.jpg [ 183.27 KiB | Viewed 9258 times ]
Offline
 Profile  
 
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 18 posts ]  Go to page 1, 2  Next

All times are UTC - 5 hours [ DST ]


 Who is online

Users browsing this forum: No registered users and 87 guests


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to:  
 
cron