 Post subject: WW&F No 9's new boiler arrives at Sheepscot!
PostPosted: Tue Jun 16, 2009 4:33 pm 
User avatar

Joined: Sun Aug 22, 2004 7:07 am
Posts: 1114
Location: Northeastern US
All, a couple of photos of No 9's new code boiler arriving at the WW&F Ry Museum's shop building at Sheepscot.

Image
prepping the boiler outside the Boothbay Ry shops for the 15 mile trip to Alna...

Image
Passing through downtown Wiscasset... (it's true, each lobster roll at "Red's Eats" contains more than one whole lobster!)

Image
Long time member Ken Maguire looks down from the 2nd floor as the trailer is backed into position for unloading. Last time outdoors for a while!


Offline
 Profile  
 
 Post subject: Re: WW&F No 9's new boiler arrives at Sheepscot!
PostPosted: Tue Jun 16, 2009 7:54 pm 

Joined: Fri Feb 23, 2007 10:28 am
Posts: 37
Location: New Boston, NH
How have they solved the design problem with the original frame where buff and draft were taken up by the original boiler? Any pictures?


Offline
 Profile  
 
 Post subject: Re: WW&F No 9's new boiler arrives at Sheepscot!
PostPosted: Tue Jun 16, 2009 8:18 pm 

Joined: Mon Nov 26, 2007 2:54 am
Posts: 1078
Location: Califoothills / Midwest Prairies / PNW
Congratulations to all on this momentous project. I was impressed with the idea of a preserved Sandy River Forney way back when the Trains magazine article came out in the 1980s. We're all glad to see the restoration of it and the WW&F.

I would bet we could count on our hands, the number of new (good) boilers for preserved locomotives made in the last 50 years. That is a trend which will obviously need to increase over time, if the interest in steam locomotion remains the same or better.


Offline
 Profile  
 
 Post subject: Re: WW&F No 9's new boiler arrives at Sheepscot!
PostPosted: Tue Jun 16, 2009 8:57 pm 
User avatar

Joined: Sun Aug 22, 2004 7:07 am
Posts: 1114
Location: Northeastern US
Hi David, the large u-shaped piece you see in this CAD image, very similar in design to that arrived at in later years by the Portland Co., has been cast and is being machined at Sheepscot now. This piece connects the front and rear frame and eliminates the firebox/boiler from the equation.

Image


Offline
 Profile  
 
 Post subject: Re: WW&F No 9's new boiler arrives at Sheepscot!
PostPosted: Tue Jun 16, 2009 10:49 pm 

Joined: Tue Sep 13, 2005 9:54 pm
Posts: 106
In Looking at the pictures of the firebox wrapper sheet staying pattern there appears to be no radial staybolts and lacking this style of staying there also appears to be no diagonal stays across the top of the crown sheet connecting the unstayed portions of the wrapper sheet. I know of another boiler that was constructed without radial staybolts that had to have diagonal stays added to correct this problem. The workmanship through appears very good.


Offline
 Profile  
 
 Post subject: Re: WW&F No 9's new boiler arrives at Sheepscot!
PostPosted: Wed Jun 17, 2009 1:16 pm 

Joined: Sun Aug 22, 2004 8:31 am
Posts: 1341
Location: South Carolina
Stephen- Very cool photos, especially the FEM (finite element modeling) image of the frame from the CAD program. Impressive to see that this level of detail has been employed for the design. Thanks for sharing.

_________________
Hugh Odom
The Ultimate Steam Page
http://www.trainweb.org/tusp


Offline
 Profile  
 
 Post subject: Re: WW&F No 9's new boiler arrives at Sheepscot!
PostPosted: Thu Jun 18, 2009 1:25 am 

Joined: Sun Sep 12, 2004 1:41 pm
Posts: 834
Location: Bowling Green, KY
Dennis,

I noticed the same area of design in the boiler, and I know the boiler you are refering to tht had to be corrected. Am I wrong to assume that the WW&F is not under the FRA? If they are not, then the boiler does meet ASME in that area and that should be plenty good enough for the state.
I rather like the use of flixible bolts throughout the crown. Also, at the top front of the side sheets there are 3 flexi's...that was where bolts were breaking on the "other" boiler without cross stays.

Very Nice Work!!!

Jason


Offline
 Profile  
 
 Post subject: Re: WW&F No 9's new boiler arrives at Sheepscot!
PostPosted: Thu Jun 18, 2009 12:07 pm 

The WW&F Railway Museum is not currently under FRA, but we anticipate that it may happen some day. As a result, our boiler builders consulted with the FRA during the construction of the boiler.


  
 
 Post subject: Re: WW&F No 9's new boiler arrives at Sheepscot!
PostPosted: Thu Jun 18, 2009 5:38 pm 

Joined: Fri Feb 23, 2007 10:28 am
Posts: 37
Location: New Boston, NH
I assume the lower end of the firebox sits within the new frame member. Looks like the lower row of staybolts and washout plugs would be covered up-tough to maintain? Also, is the new member welded to the old or fastened mechanically?


Offline
 Profile  
 
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 9 posts ] 

All times are UTC - 5 hours [ DST ]


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to: