It is currently Sat Aug 22, 2026 7:56 pm

All times are UTC - 5 hours [ DST ]




Post new topic Reply to topic  [ 17 posts ]  Go to page 1, 2  Next
Author Message
 Post subject: German Locomotive Boiler Repair Standards
PostPosted: Tue Mar 09, 2010 7:20 am 

Joined: Sat Feb 05, 2005 1:05 am
Posts: 488
See Photos

->READ FROM GERMAN WIKIPEDIA<-


Attachments:
GB01.jpg
GB01.jpg [ 74.8 KiB | Viewed 7606 times ]
GB04.jpg
GB04.jpg [ 65.78 KiB | Viewed 7606 times ]
GB05.jpg
GB05.jpg [ 65.15 KiB | Viewed 7593 times ]


Last edited by M Austin on Tue Mar 09, 2010 7:50 pm, edited 3 times in total.
Offline
 Profile  
 
 Post subject: Re: German Locomotive Boiler Repair Standards
PostPosted: Tue Mar 09, 2010 7:24 am 

Joined: Sat Feb 05, 2005 1:05 am
Posts: 488
More Photos


Attachments:
GB02.jpg
GB02.jpg [ 65.79 KiB | Viewed 7569 times ]
GB03.jpg
GB03.jpg [ 119.92 KiB | Viewed 7560 times ]
GB06.jpg
GB06.jpg [ 61.61 KiB | Viewed 7557 times ]
Offline
 Profile  
 
 Post subject: Re: German Locomotive Boiler Repair Standards
PostPosted: Tue Mar 09, 2010 9:19 am 

Joined: Sun Aug 22, 2004 7:19 am
Posts: 6464
Location: southeastern USA
Without narration I'm reading a lot into these images, but it seems the strategic leaving of the bottom knuckle of the RTS to support the combustion chamber while the throat sheet is being replaced is brilliant in its simplicity. Something holds the datum instead of having to find it again somewhere out in the air......

I take it we are looking at the same boiler at various times in its overhaul?

dave

_________________
“God, the beautiful racket of it all: the sighing and hissing, the rattle and clack of the cars over the rails. These were the sounds that made America the greatest country on earth." Jonathan Evison


Offline
 Profile  
 
 Post subject: Re: German Locomotive Boiler Repair Standards
PostPosted: Tue Mar 09, 2010 3:34 pm 

Joined: Sat Aug 21, 2004 11:31 pm
Posts: 295
Location: TEXAS
On first glance there seem to be an awful lot of square corners on the patches, and there seem to be a lot of the patches themselves. I also think I am seeing some older welded repairs that seem not to have had full penetration. They don't seem to have the same respect for stress risers that the NBIC/ASME codes have.


Offline
 Profile  
 
 Post subject: Re: German Locomotive Boiler Repair Standards
PostPosted: Tue Mar 09, 2010 3:42 pm 

Joined: Wed Jan 28, 2009 4:30 pm
Posts: 211
Where did the piece in the last image come from?


Offline
 Profile  
 
 Post subject: Re: German Locomotive Boiler Repair Standards
PostPosted: Tue Mar 09, 2010 10:50 pm 

Joined: Sat Feb 05, 2005 1:05 am
Posts: 488
It seems the EU style is to use a mud trough instead of a mud ring (more properly a Foundation Ring) for the bottom attachment of the firebox sheets.


Attachments:
GB06A.jpg
GB06A.jpg [ 12.46 KiB | Viewed 6913 times ]
Offline
 Profile  
 
 Post subject: Re: German Locomotive Boiler Repair Standards
PostPosted: Tue Mar 09, 2010 11:45 pm 

Joined: Wed Sep 01, 2004 10:05 pm
Posts: 38
Location: Martinsburg, WV
Right Matt, the mud trough appears to be a pressed steel (maybe 3/4" thick) Tross foundation ring. I have also seen this produced from square steel stock with the trough milled out. This superior design removes the corner joint between the mud ring and wrapper/side sheets where much grooving corrosion is seen to concentrate. The mud gathers in the bottom of the trough and the butt-weld joint to the wrapper and side sheets is much above the bottom of the trough. You can also see where they have removed the sleeve for the corner washout plug. This location for the front corner washouts provides for complete draining of the boiler - every drop !


Offline
 Profile  
 
 Post subject: Re: German Locomotive Boiler Repair Standards
PostPosted: Wed Mar 10, 2010 12:52 am 

Joined: Sat Aug 21, 2004 11:31 pm
Posts: 295
Location: TEXAS
Was this boiler one with the fillet welded stays? the stay holes left seem awfully clean....


Offline
 Profile  
 
 Post subject: Re: German Locomotive Boiler Repair Standards
PostPosted: Wed Mar 10, 2010 7:44 pm 

Joined: Wed Sep 01, 2004 10:05 pm
Posts: 38
Location: Martinsburg, WV
Sure does appear to be all fillet welded stays - rigids and flexibles. Also note that they put on a new smokebox and a new bottom to all 3 boiler courses.


Offline
 Profile  
 
 Post subject: Re: German Locomotive Boiler Repair Standards
PostPosted: Fri Mar 12, 2010 2:30 pm 

Joined: Sun Aug 22, 2004 12:50 am
Posts: 43
I think Jim's comment about numerous square corner patches is a mis-reading of the photos. Those look like burn lines. They appear to be taking the throat sheet out in small pieces. Any ideas why?

Michael Allen


Offline
 Profile  
 
 Post subject: Re: German Locomotive Boiler Repair Standards
PostPosted: Fri Mar 12, 2010 8:54 pm 

Joined: Sat Aug 21, 2004 11:31 pm
Posts: 295
Location: TEXAS
Good Lord, man, I know the difference between burn lines and weld lines....if you will notice the barrell patches all have square corners.


Offline
 Profile  
 
 Post subject: Re: German Locomotive Boiler Repair Standards
PostPosted: Fri Mar 12, 2010 11:46 pm 

Joined: Sun Aug 22, 2004 7:19 am
Posts: 6464
Location: southeastern USA
Are we talking about the edges of the butt seam?

I can't see if square or beveled on my monitor.

dave

_________________
“God, the beautiful racket of it all: the sighing and hissing, the rattle and clack of the cars over the rails. These were the sounds that made America the greatest country on earth." Jonathan Evison


Offline
 Profile  
 
 Post subject: Re: German Locomotive Boiler Repair Standards
PostPosted: Sat Mar 13, 2010 6:05 pm 

Joined: Sun Aug 22, 2004 11:06 am
Posts: 543
Location: NE PA
Dave,
I believe Jim means the corners of the individual flush patches, not the seams.
Mike Tillger


Offline
 Profile  
 
 Post subject: Re: German Locomotive Boiler Repair Standards
PostPosted: Mon Mar 15, 2010 8:16 am 

Joined: Sat Feb 05, 2005 1:05 am
Posts: 488
jim templin wrote:
if you will notice the barrell patches all have square corners.

6" offset on long seams is American practice also. Functions as crack arrester.

jim templin wrote:
They don't seem to have the same respect for stress risers that the NBIC/ASME codes have.


Amen.

Dave wrote:
Something holds the datum instead of having to find it again somewhere out in the air......


With so much of the boiler gone, and chains holding it to the floor, is the "vaulting" Tross speaks of, actually the boiler trying to do somersaults on the shop floor chasing the elusive datum?


Offline
 Profile  
 
 Post subject: Re: German Locomotive Boiler Repair Standards
PostPosted: Mon Mar 15, 2010 8:34 am 

Joined: Sat Feb 05, 2005 1:05 am
Posts: 488
What I do see:
IN GB04: Stitch welds already in the seams
One long seam 18" above new repair seam

IN GB05:
New first course with front tube sheet
Tacked in long seams with very poor fit-up
One and a half rows of lateral stays
Throat sheet is gone, combustion chamber throat is gone, side sheets gone, door sheet and lower backhead gone and crown sheet.


What I don't see:
No evidence of staying area above tubes in front tube sheet
No evidence of staying area above backhead staybolts
Inadequate staying of wrapper sheet (if the washout holes are fillet welded in, they provide no reinforcement for the area of the wrapper sheet removed


What I would like to know:
How cheap is labor that they can replace about 2/3 of the boiler steel that it is an economical repair?
What caused so much damage that most of the bottom half of the boiler has to be replaced?


Offline
 Profile  
 
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 17 posts ]  Go to page 1, 2  Next

All times are UTC - 5 hours [ DST ]


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to: