 Post subject: CMRR 407 Update
PostPosted: Fri May 07, 2010 7:47 am 

Joined: Tue Feb 28, 2006 8:54 pm
Posts: 1336
407 arrived safely at Mt. Tremper late in the afternoon of 5/6/10.

http://photos.greatrails.net/s/?p=168348

http://photos.greatrails.net/s/?p=168349

http://photos.greatrails.net/s/?p=168350

The crane is in place, and the lift is scheduled to begin at 8am, Friday, 5/7/2010.

EH


Offline
 Profile  
 
 Post subject: CMRR 407 Lifted into Place
PostPosted: Sat May 08, 2010 9:14 am 

Joined: Tue Feb 28, 2006 8:54 pm
Posts: 1336
The 407 was lifted into place on Friday, May 7th. Here are some photos and videos:

http://photos.greatrails.net/s/?p=168393

http://photos.greatrails.net/s/?p=168394

http://photos.greatrails.net/s/?p=168395

http://photos.greatrails.net/s/?p=168396

http://www.youtube.com/watch?v=Qq4l9OVxetQ

http://photos.greatrails.net/s/?p=168397

http://photos.greatrails.net/s/?p=168403

http://photos.greatrails.net/s/?p=168404

http://www.youtube.com/watch?v=ouaSKDoGeCE

http://photos.greatrails.net/s/?p=168405

http://photos.greatrails.net/s/?p=168406

http://photos.greatrails.net/s/?p=168409

http://photos.greatrails.net/s/?p=168410

http://photos.greatrails.net/s/?p=168411

http://www.youtube.com/watch?v=-E-qBeEhNtc

http://photos.greatrails.net/s/?p=168412

http://photos.greatrails.net/s/?p=168413

http://photos.greatrails.net/s/?p=168414

http://photos.greatrails.net/s/?p=168415

http://photos.greatrails.net/s/?p=168416

http://photos.greatrails.net/s/?p=168417

http://photos.greatrails.net/s/?p=168418

http://photos.greatrails.net/s/?p=168419

http://photos.greatrails.net/s/?p=168420

http://photos.greatrails.net/s/?p=168440


Ernie Hunt
CMRR


Offline
 Profile  
 
 Post subject: CMRR Work Report - 5/5 to 5/8
PostPosted: Wed May 12, 2010 12:12 am 

Joined: Tue Feb 28, 2006 8:54 pm
Posts: 1336
Wednesday, May 5, 2010

The 407 headed up from Staten Island early Wednesday morning.

Around mid-day we learned that the engine was in Newburgh and needed to have the weight shifted and re-weighed. Earl sped to Newburgh, as well as Al Schoessow, John Patane, Joe Logiudice, Steve Gollow, and Kevin Kesick.

http://photos.greatrails.net/s/?p=168303

http://photos.greatrails.net/s/?p=168304


Thursday, May 6, 2010

On May 6th, the engine was re-weighed and was off and running. Earl was there, with Steve Gollow, Al Schoessow, and later George Peck and others.

He is a video as it came through Kingston:

http://www.youtube.com/watch?v=A-WQBBKGa94

It arrived about 4pm at Mt. Tremper:

http://photos.greatrails.net/s/?p=168348


Friday, May 7, 2010

On May 7th, Earl led a large crew who helped unload the engine with help from the trucker, Staten Island Towing, and the Crane Operator, Costanza Crane. The crew included Mike LaLonde, Ernie Klopping, Joe Marsh, John Patane, Ed Winstanley, Ron Epstein, Mark Glaser, Tom Healy, Blaise Schatzel, Dave Mason, Paul Hintz and Harry Jameson, plus many onlookers like myself. Caboose 643 was also unloaded.

Some videos of the lifts:

Caboose 643:

http://www.youtube.com/watch?v=8Ik1uPOQII8


S-1 407:

http://www.youtube.com/watch?v=ouaSKDoGeCE

http://www.youtube.com/watch?v=-E-qBeEhNtc


Saturday, May 8, 2010

On Saturday May 8th, we had four crews working.

The 702 crew included Al Johnson, Ed Palmatier and Bill Kaba. They dismantled shelving in the boxcar, and worked on the bathroom and celestory windows in the 702.

Joe Klapkowski and John Prestopino painted the trucks on CMRR flat 202.

George Peck, Derek Stapleton, Mike Adsit and Peter Fluchere worked near Phoenicia yard. They repaired the west end switch, did ditching with the gradall and took out the ballast regulator as well.

In Mt. Tremper, Earl headed a crew including Al Schoessow, Mark Glaser, Bob Blake, Paul Hintz, Tom Healy, Dick Wilhelm, Steve Gollow, Harry Jameson, Burr Hubbell, Mike LaLonde, Paul Sternitzke, John Patane and many more.

Initial Startup of 407:

http://www.youtube.com/watch?v=wIHfdA16Qyo

http://www.youtube.com/watch?v=2SY2K0fV91o

Maiden Run to Rock Cut:

http://www.youtube.com/watch?v=GuXs_BU8FeM

http://www.youtube.com/watch?v=iKTW0WUVUy4

http://www.youtube.com/watch?v=8iRRXoUkyRg

Running with caboose 643:

http://photos.greatrails.net/s/?p=168510

http://photos.greatrails.net/s/?p=168522


Sunday, May 9th

No work crews due to Mother's day.



In all quite a week!!!!



Ernie Hunt
Volunteer Coordinator
CMRR


Offline
 Profile  
 
 Post subject: CMRR Volunteer Workdays - 5/15, 5/16
PostPosted: Thu May 13, 2010 12:33 am 

Joined: Tue Feb 28, 2006 8:54 pm
Posts: 1336
Saturday, May 15th

On Saturday, we will have 4 crews working out of Phoenicia, all working on preparing for opening day on the west end, May 29th.

The 702 crew will be working on Coach 702 starting at 10am.

George Peck plans to lead a crew to make track repairs at 23.3 with the tamper, gradall and worktrain. They plan to leave Phoenicia yard by 9am.

Joe Marsh will be continuing work on the hi-rail dump truck starting at 10am.

Earl Pardini will lead a crew completing work on the roof at Mt. Tremper station. If time permits, he plans to continue tearing down the trailer in the Phoenicia yard. He plans to start at 9am. We will also be doing a general cleanup of Mt. Tremper, so please bring any landscaping or brush cutting equipment that will help us make the station area look appealing to our customers.

No work crews will be working out of Kingston Saturday.


Sunday, May 16th.

George Peck plans to continue repairs at 23.3 on Sunday. He plans to leave Phoenicia yard with the tamper, gradall and work train about 9:30am.

Earl Pardini will lead a crew completing work on the roof at Mt. Tremper station, if this project has not been finished on Saturday.


Ernie Hunt
Volunteer Coodinator
CMRR


Offline
 Profile  
 
 Post subject: Re: Catskill Mountain Railroad News - 2010
PostPosted: Tue May 18, 2010 11:20 am 

The newspaper article and video are a bit out of date...but, hey, it's still good publicity for the Catskill Mountain RR.

Sloan

http://www.silive.com/news/index.ssf/20 ... ten_i.html


  
 
 Post subject: Re: Catskill Mountain Railroad News - 2010
PostPosted: Tue May 18, 2010 12:03 pm 

Joined: Tue Feb 28, 2006 8:54 pm
Posts: 1336
Here's another from last week:

http://www.ulsterpublishing.com/index.c ... eID=519281

EH


Offline
 Profile  
 
 Post subject: CMRR Work Report - 5/15 to 5/18
PostPosted: Wed May 19, 2010 12:18 am 

Joined: Tue Feb 28, 2006 8:54 pm
Posts: 1336
Saturday, May 15th.

Earl Pardini led a crew that finished most trusswork on the new roof for the Mt. Tremper waiting area. Peter Fluchere, Mark Glaser and John Watson assisted.

http://photos.greatrails.net/s/?p=169077

Steve Gollow, Ron Epstein and John Prestopino worked on the 407, painting the trucks and handrails:

http://photos.greatrails.net/s/?p=168975

http://photos.greatrails.net/s/?p=168977

http://photos.greatrails.net/s/?p=168976


George Peck led a crew including Dave Mason, Derek Stapleton, Paul Hintz, Al Schoessow and Bob Blake. They went down to 23.3 with the tamper and repaired the first of three slumps.


Sunday May 16th

On Sunday there were two crews working.

In Kingston, Earl Pardini led a crew consisting of Mark Glaser, Ron Epstein, Ed Winstanley, Bob Blake and Walt Otto. They completed the storage siding in the Cornell Street yard.

http://photos.greatrails.net/s/?p=169078

In Phoenicia, Earl Pardini also led a crew, starting late morning, doing additional work on 407. The crew included George Peck, PJ Hintz, Ernie Klopping, Al Schoessow and Steve Gollow.

In West Hurley, Paul Sternitzke and George Cook ran an OOS crew that cleared brush from the ROW from MP 9.4 to 9.8.


Monday, May 17th

Al Schoessow and Steve Gollow continued painting CMRR 407.


Tuesday, May 18th

Al Schoessow, Steve Gollow and Joe Logiudice took the 407 out and cut low-hanging brush.


Ernie Hunt
Volunteer Coordinator
CMRR


Offline
 Profile  
 
 Post subject: CMRR Volunteer Workdays - 5/22, 5/23
PostPosted: Thu May 20, 2010 1:40 am 

Joined: Tue Feb 28, 2006 8:54 pm
Posts: 1336
Saturday, May 22nd

On Saturday, we will have 4 crews working out of Phoenicia, all working on preparing for opening day on the west end, May 29th.

The 702 crew will be working on Coach 702 starting at 10am.

George Peck plans to lead a crew to make track repairs at 23.3 with the tamper, gradall and worktrain. They plan to leave Phoenicia yard by 9am.

Joe Marsh will be continuing work on the hi-rail dump truck starting at 10am.

Earl Pardini and Steve Gollow will be leading a "brush train" crew cutting low-hanging trees now hitting the 407. They will assemble at Phoenicia by 9am, and plan to take the "brush train" out about 9:30am. Please bring pruners, loppers, and chain saws.

No work crews will be working out of Kingston Saturday.


Sunday, May 23rd

George Peck will continue repairs at 23.3 on Sunday if they are not finished Saturday. He plans to leave Phoenicia yard with the tamper, gradall and work train about 9:30am.

Earl Pardini will lead a crew at Cornell Street in Kingston at 10am Sunday.



Ernie Hunt
Volunteer Coodinator
CMRR


Offline
 Profile  
 
 Post subject: CMRR Work Report - 5/22, 5/23
PostPosted: Tue May 25, 2010 11:39 pm 

Joined: Tue Feb 28, 2006 8:54 pm
Posts: 1336
Saturday, May 22nd

On Saturday, we had four crews working.

In Phoenicia, Al Johnson, Bill Kaba and Terry W. worked on the end doors for the 702.

Also in Phoenicia, Joe Marsh, Earl Pardini and Dick Wilhelm worked on the hi-rail dump truck and the tamper.

http://photos.greatrails.net/s/?p=169387" target="_blank

George Peck led a crew consisting of Mike Adsit and Derek Stapleton, helped out by Bob Blake and John Watson, working on our annual repair of the roadbed at MP 23.3:

http://photos.greatrails.net/s/?p=169388" target="_blank

http://photos.greatrails.net/s/?p=169389" target="_blank


Finally, Steve Gollow, helped by Al Schoessow, Earl Pardini, Mimi Pardini, John Patane, Bob Blake, John Watson and myself, ran a "brush train" from MP 23.3 to Andrew's Lane, cutting low-lying branches that were hitting the train:

http://photos.greatrails.net/s/?p=169392" target="_blank

Tom Healy also worked on caboose 643.

Sunday, May 23rd

On Sunday, we had three crews working.

In Kingston, Walt Otto continued working on flat car 278.

In Phoenicia, George Peck and Earl Pardini led a track crew that inserted 22 ties from Mt. Tremper to Campground Curve. The crew consisted of George Cook, Mark Glaser, Bob Blake, Ernie Klopping, John Prestopino and Steve Kijak.

http://photos.greatrails.net/s/?p=169423" target="_blank

http://photos.greatrails.net/s/?p=169424" target="_blank

Steve Gollow led a brush crew that cut overhanging trees and brush from Andrew's Lane to the Phoenicia yard. The crew included Paul Hintz, and Al Shoessow. They also mowed the grass in the Mt. Tremper station area.

Otto Vondrak applied numbering to CMRR 202 in the Phoenicia Yard.

Ernie Hunt
Volunteer Coordinator
CMRR


Last edited by eehiv on Wed Dec 21, 2011 3:29 am, edited 1 time in total.

Offline
 Profile  
 
 Post subject: CMRR Volunteer Workdays - 5/29 to 5/31
PostPosted: Thu May 27, 2010 7:26 am 

Joined: Tue Feb 28, 2006 8:54 pm
Posts: 1336
Saturday, May 29th

Opening day for 2010!

The 702 crew will be working on Coach 702 starting at 10am.

George Peck and Earl Pardini plan to lead crews doing last minute work getting ready for the first train at 11am, both with trackwork and cleanup. Later in the day they will be inserting ties near MP 27.8. Everyone will meet in the Phoenicia yard at 9am.

No work crews will be working out of Kingston Saturday.


Sunday, May 30th

George Peck be at the Phoenicia yard at 10am. He plans to do tie replacements at MP 27.8

No crews are scheduled for Kingston Sunday.



Monday, May 31st

George Peck be at the Phoenicia yard at 10am.

No crews are scheduled for Kingston Monday.




Ernie Hunt
Volunteer Coodinator
CMRR


Offline
 Profile  
 
 Post subject: CMRR Work Report - 5/29, 5/30, 6/1
PostPosted: Wed Jun 02, 2010 12:19 am 

Joined: Tue Feb 28, 2006 8:54 pm
Posts: 1336
Saturday, May 29th.

Saturday was the first day of operations in Phoenicia.

Earl Pardini was engineer, who was also training Al Schoessow, John Patane and Dave Heick on the 407. The train was manned by Ray Farrell, Bill Kaba, Dan Howard and Bob McDonald. Peter Fluchere was ticket agent.

http://www.youtube.com/watch?v=7AAEG1HawmQ

Our work crews continued working on our project list.

The 702 crew had a big turnout - George Liucci, Ernie Gehrer, Ed Palmatier, Al Johnson, and Gary Lowe. They installed the west end coach door and completed painting the roof.

http://photos.greatrails.net/s/?p=169771

George Peck led a crew repairing the west-end runaround in Phoenicia. They put in 22 ties. The crew included Steve Gollow, Derek Stapleton, Bob Blake, Mark Glaser, Dick Wilhelm, Here are a few photos:

http://photos.greatrails.net/s/?p=169774

http://photos.greatrails.net/s/?p=169775

http://photos.greatrails.net/s/?p=169777

http://photos.greatrails.net/s/?p=169779

http://photos.greatrails.net/s/?p=169780

http://photos.greatrails.net/s/?p=169781


Sunday, May 30th

George Peck, Earl Pardini and Paul Hintz replaced 4 ties west of Mt. Tremper.


Tuesday, June 1st

Earl Pardini, Al Schoessow and Steve Gollow brush cut the ROW in Kingston in anticipation of our runs there on June 5 and 6.


Ernie Hunt
Volunteer Coordinator
CMRR


Offline
 Profile  
 
 Post subject: CMRR Volunteer Workdays - 6/5, 6/6
PostPosted: Fri Jun 04, 2010 12:57 am 

Joined: Tue Feb 28, 2006 8:54 pm
Posts: 1336
Saturday, June 5th


The 702 crew will be working on Coach 702 starting at 10am.

Mike Lalonde and Joe Klapkowski plan to work on the 202 starting at 10am.

Paul Sternitke, Steve Gollow and I will lead a crew cutting overhead branches between West Hurley and Stony Hollow so the spray truck can pass. We will meet at West Hurley at 10am near the switch. Bring chain saws, pruners, and loppers.

No work crews will be working out of Kingston Saturday, as we will running in Kingston Saturday and Sunday for "Time Fest" from 1 to 4 pm.


Sunday, June 6th

George Peck be at the Phoenicia yard at 10am. He plans to do tie replacements at MP 27.8 if there is sufficient crew available.

Paul Sternitzke, Steve Gollow and I plan to return to West Hurley Sunday to complete work from West Hurley to Stony Hollow. Again we will meet at West Hurley near the switch at 10am.



Ernie Hunt
Volunteer Coodinator
CMRR


Offline
 Profile  
 
 Post subject: CMRR Work Report - 6/5, 6/6
PostPosted: Tue Jun 08, 2010 2:22 pm 

Joined: Tue Feb 28, 2006 8:54 pm
Posts: 1336
Saturday, June 5th

The CMRR operated trains in Kingston and out of Phoenicia on both Saturday and Sunday. In Kingston it was for "Time Fest" and Phoenicia it was our normal operation.

The brush crew was organized by Steve Gollow. Steve was joined by Chris Bigham, George Cook, Paul Sternitzke and myself. We took 2 track cars and the work flat from West Hurley and cut high and wide enough for the spray truck to pass from Stony Hollow (MP 8.3) to the West Hurley Switch (MP 10.6). The line now is more open in this area than it has been for many years.

http://photos.greatrails.net/s/?p=170419

http://photos.greatrails.net/s/?p=170420

http://photos.greatrails.net/s/?p=170421

http://photos.greatrails.net/s/?p=170422

http://photos.greatrails.net/s/?p=170423

Mike LaLonde and Joe Klapkowski continued work on flat 202, and Derek Stapleton painted the ends of caboose 697.


Sunday, June 6th

The CMRR operated again in Kingston and Phoenicia.

On Sunday, George Peck worked in the Phoenicia yard area.


Ernie Hunt
Volunteer Coordinator
CMRR


Last edited by eehiv on Thu Jun 10, 2010 11:08 am, edited 1 time in total.

Offline
 Profile  
 
 Post subject: CMRR Volunteer Workdays - 6/12, 6/13
PostPosted: Thu Jun 10, 2010 11:07 am 

Joined: Tue Feb 28, 2006 8:54 pm
Posts: 1336
Saturday, June 12th


The CMRR will hold its first rules class of the year in Phoenicia in coach 702 from 9am to 5pm. Please attend if you wish to qualify for 2010. A second class is scheduled for July 11th for those who cannon make this class.

George Peck will be organizing a track work crew starting at the Phoenicia section house at 9am.

No work crews will be working out of Kingston Saturday.


Sunday, June 13th

George Peck be at the Phoenicia yard at 10am. He plans to do tie replacements at MP 27.8 if there is sufficient crew available.

Paul Sternitzke, Steve Gollow and I plan to return cut the line from C9 (MP 5) to 209 (MP 5.4) starting about 9am. Afterwards, we plan to go to West Hurley, inspect the line from MP 5.5 to 16 .2, and cut sections as necessary.

Cornell Street will open at 10am.




Ernie Hunt
Volunteer Coodinator
CMRR


Offline
 Profile  
 
 Post subject: CMRR Work Report - 6/12, 6/13, 6/15, 6/16
PostPosted: Wed Jun 16, 2010 10:33 pm 

Joined: Tue Feb 28, 2006 8:54 pm
Posts: 1336
Saturday, June 12th.

On Saturday, Dave Heick was engineer, and Ray Farrell and Dan Howard were train crew.

George Peck and Derek Stapleton worked on projects in the Phoenicia Yard.

The rest of the volunteers were in the CMRR's rules class in coach 702 in Phoenicia.

Sunday, June 13th

On Sunday, Paul Sternitzke and Steve Gollow led a brush crew that included George Cook, Todd Syska, John Patane, and myself. The crew cut brush from MP 5 to 5.4:

http://photos.greatrails.net/s/?p=170798

http://photos.greatrails.net/s/?p=170799

http://photos.greatrails.net/s/?p=170800

The crew moved to West Hurley after lunch, cut a large tree down at MP 8.2 and inspected the line from MP 6.55 to 16.2.

http://photos.greatrails.net/s/?p=170801

http://photos.greatrails.net/s/?p=170802


Cornell Street was open today. In addition to Earl, Al Schoessow, mark Glaser, Bob Blake and Walt Otto were present. From Mark Glaser:

"Ernie, On Sunday, Earl, Al Schoessow, and Mark Glaser removed the west-end wheel set on the open passenger flat [278] for spring pan repairs. Walt Otto continued installing railing arm rests on same while Bob Blake pushed along prepping RS-1 400 for primer. A portion of the yard was weed-whacked."

In Phoenicia, George Peck and Joe Marsh completed work on the hi-rail dump truck.

Tuesday, June 15th

On Tuesday June 15th, Al Howes and Mike LaLonde removed about 20 stumps from the future Shokan siding with the crane. Dick Ray also helped out.


Wednesday, June 16th

Steve Gollow, Paul Sternitzke and John Patane removed trees near C9 and cut trees near Beesmer Road.


Ernie Hunt
Volunteer Coordinator
CMRR


Offline
 Profile  
 
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 137 posts ]  Go to page Previous  1, 2, 3, 4, 5, 6, 7 ... 10  Next

All times are UTC - 5 hours [ DST ]


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to: