Work on 4501 continues to stay focused on firebox completion. All the rigid crown stays have been installed and are ready for trimming to length and driving. The expansion stays are now being installed. Two of the four corner patches have been fit-up. Caps are now installed on all the flexible sleeves on the backhead and side sheets. Other items underway include installation of the boiler check bodies and lapping of seats for other boiler fittings.

Machinery work includes continued work on the driving wheels and boxes. Design of modifications to the trailing truck are underway. These modifications will correct original design problems with the spring rigging that were later corrected with later designs of the Hodges Trailing Truck. We will also apply roller bearings to the trailing truck.

Tender work includes completion of a hydrostatic test following the coal bunker modifications. The area for the stoker trough has been treated with a coal tar epoxy and is ready for installation of the stoker trough. Fabrication of the coal gates is well underway.

Enjoy the pictures.


Attachments:
File comment: New Coal Gates for Tender being Fabricated.
New Coal Gates.jpg
New Coal Gates.jpg [ 88.71 KiB | Viewed 6778 times ]
File comment: Main Driving Wheel in Quartering Machine having crank pin bore machined.
Main Driver Crank Pin Hole Bored.jpg
Main Driver Crank Pin Hole Bored.jpg [ 78.04 KiB | Viewed 6778 times ]
File comment: Some of the driving boxes after weld repairs were completed.
Driving Boxes Set 1.jpg
Driving Boxes Set 1.jpg [ 91.25 KiB | Viewed 6778 times ]

_________________
G. Mark Ray - TVRM
www.tvrail.com
Offline
 Profile  
 
 Post subject: Re: Southern 4501 11-30-12 Update
PostPosted: Fri Nov 30, 2012 11:17 pm 

Joined: Sun Aug 22, 2004 9:34 am
Posts: 382
More pictures


Attachments:
File comment: Left rear corner patch being fitted for weldout.
LR Corner Patch Fitted Up.jpg
LR Corner Patch Fitted Up.jpg [ 75.44 KiB | Viewed 6771 times ]
File comment: Firebox left side with staybolt caps installed.
Left Side Firebox Caps Installed.jpg
Left Side Firebox Caps Installed.jpg [ 111.18 KiB | Viewed 6771 times ]
File comment: Firebox right side with staybolt caps installed.
Right Side Firebox Caps Installed.jpg
Right Side Firebox Caps Installed.jpg [ 96.93 KiB | Viewed 6771 times ]

_________________
G. Mark Ray - TVRM
www.tvrail.com
Offline
 Profile  
 
 Post subject: Re: Southern 4501 11-30-12 Update
PostPosted: Fri Nov 30, 2012 11:21 pm 

Joined: Sun Aug 22, 2004 9:34 am
Posts: 382
One more set of pics.


Attachments:
File comment: Exterior view of crown bolts prior to trimming and driving.
Crown Bolts Prior to Driving.jpg
Crown Bolts Prior to Driving.jpg [ 95.02 KiB | Viewed 6767 times ]
File comment: Tapered crown stays installed through crown sheet.
Tapered Crown Bolts Threaded In 11-30-12.jpg
Tapered Crown Bolts Threaded In 11-30-12.jpg [ 84.79 KiB | Viewed 6767 times ]
File comment: Flush patch being installed to remove original forge weld.
Flush Patch Repair 11-30-12.jpg
Flush Patch Repair 11-30-12.jpg [ 87.39 KiB | Viewed 6767 times ]

_________________
G. Mark Ray - TVRM
www.tvrail.com
Offline
 Profile  
 
 Post subject: Re: Southern 4501 11-30-12 Update
PostPosted: Sat Dec 01, 2012 12:08 am 

Joined: Sun Aug 22, 2004 3:37 pm
Posts: 1325
Location: Pacific, MO
Beautiful work! When all is done, she should be good for years to come.
Are you converting the pilot truck to roller bearings also?
I think I read that you're going to oil in the driving boxes?


Offline
 Profile  
 
 Post subject: Re: Southern 4501 11-30-12 Update
PostPosted: Sat Dec 01, 2012 12:32 pm 

Joined: Sun Aug 22, 2004 9:34 am
Posts: 382
Yes to both questions. We expect to order the new wheelset for the lead truck in January along with the boxes to adapt the wheelset into the existing pedestal openings in the truck frame. All of the driving boxes will be modified to accept the spring pad lubricator system that has worked so well on our Ks Class locomotive.

We also have a set of Franklin automatic wedge adjusters that were manufactured and applied to 4501 in 1968. Also at that time was an initial attempt to run 4501 on oil bearings. The attempt failed so both systems were removed. All the parts survived through the years (this was 44 years ago!). We think we've pinpointed why the 1968 attempt failed but we've not decided on reapplying the automatic wedge adjusters initally.

_________________
G. Mark Ray - TVRM
www.tvrail.com


Offline
 Profile  
 
 Post subject: Re: Southern 4501 11-30-12 Update
PostPosted: Sat Dec 01, 2012 4:38 pm 

Joined: Sun Aug 22, 2004 8:31 am
Posts: 1341
Location: South Carolina
Very impressive work. I hadn't noticed this detail previously:

Image

The backhead's butt-welded to the wrapper sheet. That's an update, correct? Looks like you're half-way to a welded boiler shell.

_________________
Hugh Odom
The Ultimate Steam Page
http://www.trainweb.org/tusp


Offline
 Profile  
 
 Post subject: Re: Southern 4501 11-30-12 Update
PostPosted: Sun Dec 02, 2012 2:43 pm 

Joined: Sun Aug 22, 2004 9:34 am
Posts: 382
Yes, we eliminated the riveted joint. The full penetration weld allowed us to add extra bolts to make it work.

_________________
G. Mark Ray - TVRM
www.tvrail.com


Offline
 Profile  
 
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 7 posts ] 

All times are UTC - 5 hours [ DST ]


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to: