It is currently Thu Aug 20, 2026 2:40 pm

All times are UTC - 5 hours [ DST ]




Post new topic Reply to topic  [ 198 posts ]  Go to page Previous  1 ... 5, 6, 7, 8, 9, 10, 11 ... 14  Next
Author Message
 Post subject: Re: Baldwin 26
PostPosted: Wed Nov 06, 2013 9:55 pm 

Joined: Mon Sep 27, 2004 6:17 pm
Posts: 527
Location: Scranton, PA
I wouldn't put too much stock in Railpace editorials. I had the same editor rail against my employer for running trains when "the lighting wasn't right" during an NRHS slideshow.

_________________
Dave Crosby


Offline
 Profile  
 
 Post subject: Re: Baldwin 26
PostPosted: Wed Nov 06, 2013 10:46 pm 

Joined: Mon Aug 23, 2004 5:10 pm
Posts: 1182
In addition to his editorial quirks, the editor and publisher of Railpace is a lousy driver. he doesn't think at all about endangering the lives of other drivers on rural two lane roads if they are in HIS way when he wants to chase a train. Between the two, I have no reason whatever to take or read Railpace.


Offline
 Profile  
 
 Post subject: Re: Baldwin 26
PostPosted: Thu Nov 07, 2013 3:48 am 

Joined: Sun Aug 22, 2004 7:07 am
Posts: 737
Location: Philadelphia Pa
Dave Crosby wrote:
I wouldn't put too much stock in Railpace editorials. I had the same editor rail against my employer for running trains when "the lighting wasn't right" during an NRHS slideshow.


I never put much stock into any mass media, small or large. I just find it irritating that anyone would stoop to that level, regarding a well documented rebuild where questions have been asked and answered very clearly, and do so freely as if they were the one funding it.

Better appreciation needs to be focused on the scope of the work, not the time withing which it's completed.


Offline
 Profile  
 
 Post subject: Re: Baldwin 26
PostPosted: Thu Nov 07, 2013 9:51 am 

Joined: Sun Aug 22, 2004 1:51 pm
Posts: 12147
Location: Somewhere east of Prescott, AZ along the old Santa Fe "Prescott & Eastern"
Wayne, personal attacks of that nature, no matter how well deserved, are undignified and unprofessional, and lower your stock several points on a forum like this.

You should know better.


Offline
 Profile  
 
 Post subject: Re: Baldwin 26
PostPosted: Thu Nov 07, 2013 10:57 am 
User avatar

Joined: Sun Aug 22, 2004 7:07 am
Posts: 1114
Location: Northeastern US
Looking REALLY good, Tim, thanks for sharing your pics!!

Stephen


Offline
 Profile  
 
 Post subject: Re: Baldwin 26
PostPosted: Mon Jan 06, 2014 4:22 pm 

Joined: Mon Aug 30, 2004 3:24 pm
Posts: 462
Location: Scranton, PA
Image

Happy New Year, everyone. These photos were taken on January 4, 2014. As you compare these with the previous photos, some pieces added have been taken off, while others are added to the engine. I was trying to find some big leaps forward to show, but much of the work is slow and steady.

Image


The grate-shaker levers and the cab floor are installed.
Image

The air brake pump and the reservoir tank are rather new additions. Many pieces are getting re-worked or refined for re installation.

If it hasn't been mentioned before, the "striping" on the sides of the boiler are from styrofoam spacers used in measuring the boiler jacketing sheets to make sure they will fit when the actual lagging is installed.

_________________
http://www.nrhs.com/


Offline
 Profile  
 
 Post subject: Re: Baldwin 26
PostPosted: Mon Jan 06, 2014 10:26 pm 

Joined: Mon Aug 23, 2004 8:10 am
Posts: 2499
IMHO not only is #26 going to be a solid machine when done, her green coat is going to make her a favorite of many. It isn't often that a restored steam locomotive can be painted anything but black and be historically accurate. I think Steamtown hit it out of the park with going back and making her green. #113, #26, #31, #15, #58 and soon #9 and #4039 could make the 0-6-0 the most popular gals of mid-Atlantic steam.

Good on ya', guys!

Rob


Offline
 Profile  
 
 Post subject: Frame straightening
PostPosted: Tue Jan 07, 2014 1:51 am 

Joined: Sun Jun 23, 2013 1:16 pm
Posts: 231
I just read all thru this thread and am curious if there been a discussion on how they straightened the frame- maybe in another thread somewhere? I didn't read anything about it on here. Must have been a previous thread, I'm guess.

I'd like to know how they did it, and how they think it got bent, too. If someone knows what thread to go read... put me a link on here to get me headed in the right direction.


Offline
 Profile  
 
 Post subject: Re: Baldwin 26
PostPosted: Tue Mar 04, 2014 8:02 pm 

Joined: Mon Aug 30, 2004 3:24 pm
Posts: 462
Location: Scranton, PA
Two months after I last posted photos, here we are again. There actually is progress. It just takes a keen eye.
Image
The first thing I noticed when I walked in the shop today was the addition of the dynamo.
Image
This adds a bit to the skyline of the locomotive. Sometimes parts are just placed on the engine to get them off the floor, and then they come back off when it is time to make adjustments. Many of the parts were repaired years ago. They may have been recently cleaned, painted or placed on the boiler.
Image
Front view.
Image
The tender trucks were repaired. Leaf springs were modified due to the stiffness in the leaves that weren't giving in the way the older leaves had. Being accurate in size and number of leaves kept the tender riding higher than the engine.
Image
The trucks will be going in the paint shop soon, too.
Image
Speaking of the tender. Dazzling in her Baldwin green.
Image
From this side, you can see additional piping that wasn't here in January. Some work done to the turret valve, too.
Image
That's all I have for now. Discuss.

_________________
http://www.nrhs.com/


Offline
 Profile  
 
 Post subject: Re: Baldwin 26
PostPosted: Tue Mar 04, 2014 8:59 pm 

Joined: Mon Jun 24, 2013 12:54 pm
Posts: 320
Once restored what jobs will she have?


Offline
 Profile  
 
 Post subject: Re: Baldwin 26
PostPosted: Tue Mar 04, 2014 11:05 pm 

Joined: Mon Aug 30, 2004 3:24 pm
Posts: 462
Location: Scranton, PA
26 is a switcher, so the mainlines won't see her very often. Moscow, 13 miles away, is too far for this locomotive to run.
Steamtown runs a short distance (3 mile round trip) shuttle through the former DL&W City Yard in Scranton. Back and forth through switches beginning at the turntable and running eventually to the University of Scranton and return. This takes about 30 minutes.
For 2014, this trip will be extended on Sundays for now to go to the Nay Aug tunnel. This trip will be about 5 miles round trip and take about 45 minutes. Both of these yard trains, using the term 'yard' loosely, would be ideal for 26 and 2 coaches.
Here she is in July 1999 with the yard shuttle.
Image

26 may also be assigned yard switching duties and moving pieces around the locomotive shop area.
We are looking into where she might go on the Delaware-Lackawanna's Carbondale line (former Delaware & Hudson mainline). In the late 1990s she hauled the Santa Train for Christmas in a Small Town where Santa visited at Carbondale, Jessup and Olyphant. Three other towns have joined this event, so it has to be determined if this is a good trip for 26. Water and coal only go so far, so planning those logistics may affect that train schedule.

I hope to see you on board, southern 154

_________________
http://www.nrhs.com/


Offline
 Profile  
 
 Post subject: Re: Baldwin 26
PostPosted: Tue Mar 04, 2014 11:56 pm 

Joined: Mon Aug 23, 2004 8:10 am
Posts: 2499
southern154 wrote:
Once restored what jobs will she have?


I figure she will have a multitude of jobs in addition to pulling the trips Tim mentioned.

She will be the parks's only in-steam ambassador until #3713 is done. I have to guess that her pretty green dress will only enhance her ability to charm the average tourist.

She will also put the rest the complaints that Steamtown only runs Canadian engines, hasn't competed a full restoration, isn't running steam, etc... and charm the average buff.

If I can reveal my steam geek side, I have to say that *finally* having Baldwins in the preservation era running in green (yes, I am looking at you DL&N #7) is a major victory for the correct interpretation of these artifacts (no disrespect to Reader #108 running in green at North Conway, but it was a few shades closer to Kelly than Baldwin green. She was a great cab ride, but that's another story...)

I would love to see more repaints of other locomotives with past histories of wearing colors other than black. There has to be at least two dozen surviving Baldwins if not more appropriate for green. And that's not to mention those old enough to have worn lake or red. Thank heaven for Jim Wilkie's extensive research on the topic.

Rob


Offline
 Profile  
 
 Post subject: Re: Baldwin 26
PostPosted: Fri Mar 07, 2014 8:04 pm 

Joined: Thu Feb 27, 2014 10:08 am
Posts: 733
We were fortunate to be up in Scranton in late July at the time when the tender was fresh out of the paint shop. It was on its way back to the shop so the shop staff could remove the tank and address the over springing issue Tim O'M mentioned. The lighting was not great and there are a lot of reflections in the freshly painted surface, but this pic gives an idea how nice this loco is going to look.

Unfortunately, we did not get a close up image of the lettering detail, which is done in a fantastic faux silver leaf.


Attachments:
Baldwin 26 Tender 07-28-13.jpg
Baldwin 26 Tender 07-28-13.jpg [ 90.57 KiB | Viewed 11609 times ]
Offline
 Profile  
 
 Post subject: Re: Baldwin 26
PostPosted: Fri Mar 07, 2014 10:57 pm 

Joined: Mon Jan 12, 2009 9:37 pm
Posts: 242
There is no reason to believe this locomotive will be unable to make the full mainline run. It will unlikely be able to handle the same tonnage as 2317 but the low speed these trains normally operate at should be well within the capability of a large 0-6-0 especially a Baldwin. Certainly a trial trip is warranted.


Offline
 Profile  
 
 Post subject: Re: Baldwin 26
PostPosted: Fri Mar 07, 2014 11:39 pm 

Joined: Thu Jul 11, 2013 1:20 pm
Posts: 3
No. Keyhole firebox, saturated steam, lack of pilot or trailing truck, limited timetable speed.

NOT going to Moscow.


Offline
 Profile  
 
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 198 posts ]  Go to page Previous  1 ... 5, 6, 7, 8, 9, 10, 11 ... 14  Next

All times are UTC - 5 hours [ DST ]


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to: