It is currently Thu Oct 01, 2026 1:22 am

All times are UTC - 5 hours [ DST ]




Post new topic Reply to topic  [ 6 posts ] 
Author Message
 Post subject: Valley Railroad 2-8-2 #40
PostPosted: Sat Feb 04, 2006 11:21 pm 

Joined: Wed Feb 02, 2005 2:13 pm
Posts: 243
[redacted]


Last edited by Christian S. on Fri Feb 28, 2025 10:11 pm, edited 1 time in total.

Offline
 Profile  
 
 Post subject: Re: Valley Railroad 2-8-2 #40
PostPosted: Sun Feb 05, 2006 12:07 am 

Joined: Sun Aug 22, 2004 10:21 pm
Posts: 136
Location: Wisconsin
Still under rebuild. No ETA that I'm aware of. Jim


Offline
 Profile  
 
 Post subject: Re: Valley Railroad 2-8-2 #40
PostPosted: Mon Feb 06, 2006 12:20 am 

Joined: Mon Aug 23, 2004 2:14 pm
Posts: 618
Location: Essex, Connecticut, USA
Dear Christian:
No. 40 is still in the shop.
We have formed a new door sheet (heating & beating method) and have it nearly fit up to the existing crown sheet and upper side sheets. Once it has been fitted and secured with fitup bolts and a few tack welds, we will fit up the new 1/2 side sheets. Once these have been fit, we will transfer the locations of the staybolt hole to the new sheets, remove them, drill the holes for the stays and rivets and put them back in, secured with fitup bolts and tack welds. Once this has been done, we will tap some holes and install some staybolts prior to welding the seams. Once the seams have been welded, the rest of the staybolts and rivets will be installed at which point we can get everything caulked up and hydroed.
Much of the ashpan wants renewal/modification.
The trailing truck has been rebuilt and is ready to install once the ashpan is in.
The cab is in need of minor repairs prior to reinstallation along with the insulation, jacket and piping, etc.
It is our fondest hope to have it done prior to summer...
J.David


Offline
 Profile  
 
 Post subject: Re: Valley Railroad 2-8-2 #40
PostPosted: Mon Feb 06, 2006 11:48 am 

Joined: Sun Aug 22, 2004 11:26 am
Posts: 4777
Location: Maine
Any word on ex-CPR G5 Pacific 1246?

_________________
"It's only impossible until it's done." -Nelson Mandela


Offline
 Profile  
 
 Post subject: Re: Valley Railroad 2-8-2 #40
PostPosted: Mon Feb 06, 2006 2:05 pm 

Joined: Wed Feb 02, 2005 2:13 pm
Posts: 243
[redacted]


Last edited by Christian S. on Fri Feb 28, 2025 10:11 pm, edited 1 time in total.

Offline
 Profile  
 
 Post subject: Re: Valley Railroad 2-8-2 #40
PostPosted: Mon Feb 06, 2006 9:30 pm 

Joined: Sun Aug 29, 2004 1:04 pm
Posts: 625
There are several of us at A&R that are very glad to hear the 40 is progressing well. We still keep track of her. I will pass the word around. Thanks for all the work you are doing on our old hog.

John Bohon


Offline
 Profile  
 
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 6 posts ] 

All times are UTC - 5 hours [ DST ]


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Jump to: